Wild guesses aside, does anybody have knowledge of what road construction like this typically takes (keep the Disney construction jokes out of it). I know they can take a long time. There is one close to me for (what seems like) a simple entrance onto a highway - one direction is expected to finish in 2018, while the other not till 2021 -- and it seems to the untrained eye like something simple to do (in fact less complicated than what Disney has here).
12-24 months, depending on how badly they want it done. It's likely not using "Disney" money, so they won't need to drag it out over multiple fiscal years. I predict a smaller range of 12-18 months from start to finish, given that this is a MUCH needed improvement, and will be critical for the expected increase in traffic to DHS once TSL and SWL are both complete.
how long is it usually from a permit like this to seeing actual construction?
A few months.
since star wars land has no dates or timeline its possible this will be built at the same time toy story land is being built and still be done before sw land is complete
Yes and yes. Work will begin as soon as feasible, and it will be done well before SWL is completed (or, perhaps, started). It will run concurrent with TSL, and their goal is probably to have the roadwork complete BEFORE TSL opens, for the sake of handling the small bump in attendance at DHS.