Unfortunity, you need to understand, this is not a light duty ski lift......
1. This 20 person or more gondola requires MASSIVE foundations in the soft wet ground, MASSIVE steel tower, with wings and supports.
2. The mechanics require MASSIVE AND HEAVY built gearing and power. All very expensive, while not as much as a monorail the monorail is faster and high captivity and possibly higher then light or pods.
3. The ones in the picture I was are not the ones they are going to build. We don't know for a fact what the final plans with be.
4. 20 passenger gondolas are not high capacity units,.. It will take easily 2 minutes before you manage to unload 20 passengers and strollers and reload 20 passenger ans strollers. Slower yet if you need to deal with wheel chairs and scooters. Seamless is not a word I would use.
So as I said...we need more facts.....AKK