I looked everywhere but inside that red circle and I have no clue what you are talking about.There's always an alternative if it gets too hot ! 'Necessity is the mother of invention' !
View attachment 246100
@Lift Blog , how realistic is this scenario??
Agreed -- I don't see any kind of cooling device. I do see evidence that a skunk apparently got into the cabin, though...I looked everywhere but inside that red circle and I have no clue what you are talking about.
Agreed -- I don't see any kind of cooling device. I do see evidence that a skunk apparently got into the cabin, though...
Coulda been a snake or a 'gator, too... we'll see if that becomes a problem at WDW.Gondola ghosts. Surprised no one has brought up the problem of gondola ghosts so far.
We await results and the first ride in 2019.
Look for photos and trust nothing else.
From Dis? Please, they will drag this out to spread costs and deliver it when they announced they would - 2019Really? Joking aside, I figured it would be done sometime next year.
From Dis? Please, they will drag this out to spread costs and deliver it when they announced they would - 2019
No need to be so condescending. I missed that a date had been announced. Geesh.
That date has not been announced, but insiders have indicated that it would open in 2019.
That date has not been announced, but insiders have indicated that it would open in 2019.
Doubt it.I wonder if there is any potential to open sections earlier. Say from Pop/Art to The CB hub and from that hub to HS.
Hmm. Does that mean if one segment goes down, all segments have to stop?Doubt it.
The entire line would need to be completed to open the main hub as that is the convergence point for all three lines.
IIRC the CB hub us one building. If it were 3 seperate building, they might be able to do it, but I don't see the logic / benefit of a staged opening.
When under Construction.... Which means unfinished....Hmm. Does that mean if one segment goes down, all segments have to stop?
No but there would be no point allowing people to board if they are just going to pile up at a transfer point so they would cut off boarding. Like with the monorail, if it goes down you are directed to buses or for the ring route you take the ferry.Hmm. Does that mean if one segment goes down, all segments have to stop?
Insiders have stated some other mass transit system is being looked at for implementation in other parts of the property.I'm just dreaming here....but assume the system, once operational, is deemed a success operationally by Disney. If this turns out to be the case Disney is rumored to have plans to expand by adding a line to connect the Coronado Resort and DAK to the existing Phase 1 lines.
My thought is what if the DAK station is a "V" shaped station that has 2 lines in it. One line that connects to the phase one routes. The 2nd line would be an express route (direct/ non stop - ala Express Monorail Line) to the TTC. I envision the line running along the other side of World Drive opposite the Epcot monorail beam. This would allow park hopping between MK and DAK easy. It would make a 2nd choice (but not convenient) method to park hop between DHS and MK. But most importantly I would this k to Disney would be that this line would essentially connect the three primary MK resorts to all 4 parks without having to ride a bus. Seems like a premium upgrade for these 3 WDW hotels. Disney will always see these as their premiere 3 resorts in WDW regardless whether we all agree with their operating standards.
That’s a fanboi rumour. It has no basis in fact.I'm just dreaming here....but assume the system, once operational, is deemed a success operationally by Disney. If this turns out to be the case Disney is rumored to have plans to expand by adding a line to connect the Coronado Resort and DAK to the existing Phase 1 lines..