One of the things we need to look out for is when they start removing the scaffolding. Remember that this is "toothpick" scaffolding. To remove it they need to remove the decking and railings from the top level, cut off the "toothpicks" that hold it up, patch the holes and paint them to blend in with the rest of the rockwork. Once this is done on the top level, they can move down to the next level and repeat. The result is that it takes a lot longer for this to come down then normal scaffolding, so it could take a couple weeks to remove it all.