Rook26
Member
Appears to have been a clean up, drop is different. Nothing major that I can tell.I suppose that's -5 then.
Appears to have been a clean up, drop is different. Nothing major that I can tell.I suppose that's -5 then.
How is the drop different?Appears to have been a clean up, drop is different. Nothing major that I can tell.
Thanks for the update. Did it close after the breakdowns?Don't know if the drop just felt less steep because of the new boats. My wife has me second guessing because she couldn't tell the difference. Sorry writing while walking. I had my 1 year old on with me the second time when it broke down multiple times and wife isn't happy that I got greedy... lol
It was just a refurbishment to fix some existing issues. Was never really meant to include additions or enhancements.Soo nothing has changed?? Wow... Although I guess I shouldn't be surprised.
It was just a refurbishment to fix some existing issues. Was never really meant to include additions or enhancements.
And the ride itself working properly.Don't need enhancements. Just need a ride with all effects working.
And the ride itself working properly.
The AAs should look really good. Sound should be better.
How does the Davy/Blackbeard waterfall look? Anyone heard?
Good, It made no sense to have a skull painted on the Fort that the Pirates are attackingPhoto from ***** on Twitter showing they painted over the pirate skull painting.
Some progress is better than none at all.Soo nothing has changed?? Wow... Although I guess I shouldn't be surprised.
Some progress is better than none at all.
Good grief... what is with you guys. It was to fix and refresh the stuff that was already there. There was never a word mentioned that much of anything was going to be different other then that. The fact that it broke down during the soft opening was somewhat when that should be happening. Otherwise it would be a hard opening, meaning ready to go. We never did get a description of what the "breakdown" was about or the duration of each assumed stop. Adjustments for water pressure, etc.?I suppose.
Total time was about 30-45 minutes, it was number to bumber the whole time. Announcement was that the ride would be shut down and restarted, pumps would restart again, please stay away from track edges. While I was still in loading the ride had to be restarted, right after we boarded. Looked like lots of commotion in the control room. . I'm not complaining at all. The ride had a fresh feel to it, the lighting was great, the hat pirate was looking goodGood grief... what is with you guys. It was to fix and refresh the stuff that was already there. There was never a word mentioned that much of anything was going to be different other then that. The fact that it broke down during the soft opening was somewhat when that should be happening. Otherwise it would be a hard opening, meaning ready to go. We never did get a description of what the "breakdown" was about or the duration of each assumed stop. Adjustments for water pressure, etc.?
wow marni.. your bothans keep you up to date 24/7?I suggest anyone in the MK make their way to Adventureland. Say around now.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.