Purduevian
Well-Known Member
Wasn't trying to correct you. Of course they can lower the throughput on BTMRR. I literally put "They really don't want to increase dispatch times on that ride unless they remove coaster trains." DLR operates with less train cars at opening every day and I think only 1 loading station.Then he could have shared with the class vs trying to correct me with a 'TLDR' that isn't even applicable to the point. But, you got something from it.. so interesting for you.
The point of the post wasn't that you were wrong. The point of the post was I thought people might be interested in this odd quirk of BTMRR as it was tangentially related to the discussion of purposely lowering capacity on rides.