Fairies meet n greet running behind schedule

drew81

Well-Known Member
Original Poster
The Fairies meet n greet construction is running behind schedule and won't be opening tomorrow as planned. Until the construction work is done they will be greeting outside.

The plan is to have Tinkerbell with 2 other fairies once it opens.
 

Neverland

Active Member
Do you know if they'll rotate the fairies again like in Pixie Hollow? Poor Fawn, Silvermist, and Iridessa haven't been seen in ages...
 

MerHearted

Well-Known Member
The Fairies meet n greet construction is running behind schedule and won't be opening tomorrow as planned. Until the construction work is done they will be greeting outside.

The plan is to have Tinkerbell with 2 other fairies once it opens.

She's only going to be with one other fairy. Vidia rotating with Rosetta.
 

drew81

Well-Known Member
Original Poster
Can anyone else confirm the room is now open? I've been told it is.


Any pictures would be great!
 

MKCP 1985

Well-Known Member
For Wendy, Michael and John, going to Neverland was an adventure. Getting to Pixie Hollow would be an adventure, I suppose. :shrug:
 

jt04

Well-Known Member
For Wendy, Michael and John, going to Neverland was an adventure. Getting to Pixie Hollow would be an adventure, I suppose. :shrug:

Exactly. I have a great idea but I think I will wait a month or so in case someone who counts has a similar idea. :cool:
 