Fairies meet n greet running behind schedule

KingdomofDreams

Well-Known Member
Something with a Neverland island and Peter Pan theme could have very interesting possibilities and could fit in Adventureland. Ordinary children in Neverland with the Lost Boys, pirates, fairies...
 

Neverland

Active Member
Something with a Neverland island and Peter Pan theme could have very interesting possibilities and could fit in Adventureland. Ordinary children in Neverland with the Lost Boys, pirates, fairies...

I wouldn't mind that, but as of now, fairies don't exactly fit into the tiki-jungle theme that Adventureland has. It's like carpets x a million; at least with that, they rethemed the area around it to Agrabah.

And this is coming from somone who likes the fairies. Just not in Adventureland!
 

KingdomofDreams

Well-Known Member
Well just my humble opinion, but Adventureland currently has no cohesive theme other than adventure. You have The Tiki Room – singing birds in a South Pacific/Polynesian setting, Pirates of the Caribbean – the Caribbean, Jungle Cruise – “a grand tour of the world's most exotic rivers in Asia, Africa and South America”. I think an exotic Neverland Island would fit in Adventureland very nicely if done right, and would work much better thematically than Magic Carpets of Aladdin does currently.

Thanks for sharing the vid RAXIP. My first thought was that they need more of a transition from real world to the fairies. I think the fairy M&G would be so much better in an outdoor setting. The set is pretty nice though.
 

jt04

Well-Known Member
Video:
[youtube]IBT73BoaUHM[/youtube]

Best temp location I have ever seen and there really isn't any question that PH should be in the MK. Adventureland works perfectly since the theming is tucked away like this.

BTW, not sure what the characters get paid but they deserve every penny and then some. That can't be the easiest job in the world.

Well done.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom