Photo update as of Friday, June 24. "Landscape" plants brought to the top observation deck.
View attachment 147884
Some sort of electronic sign perhaps being installed at the top deck, facing the Disney bus transportation hub. The fire escape was painted black.
View attachment 147885
An overall view of the top observation deck. See comments in the following close-up photo below.
View attachment 147886
As seen in this close-up, heaters have been installed in the overhead for winter use. Speakers were installed on the vertical poles. A series of narrow "drink ledges" have been installed along the outer glass walls.
View attachment 147887