Snapped a few cell phone pics of the pool construction progress. I apologize for the quality, hopefully I can get some better ones in the coming days. Enjoy!
Nice photos. Be there in ... 112 days ... lol. (BTW, was that a picture of the hot tub? -- looks small but I guess it could be because of all the concrete still around it).
There are two hot tubs, the first is in the 5th picture and the second in the 7th picture. The second one (behind the new fort) appeared bigger than the other but they are both larger than the old hot tub. Last I knew the old hot tub was no longer going to be a hot tub but instead a waterfall feature, couldn't get a good enough perspective to tell if that's for sure or not. Should be able to update on that in a few days.
In the 2nd photo doesn't it look as though the pool's floor is doing a nice incline up to the pool's edge? Wonder if they will make that sand bottomed like at AKL???
The theming looks nice! Has the pool area always looked like this? The pool seems small in the pictures, though. Aren't there multiple pool areas at CBR? Thanks for the updates!