Here's a question: on the leaked blueprints, the one image has what appears to be a queue on it to the side of the show building for the E-ticket:
The queue appears to be in the same footprint at the boat ride show building (unless that is just the plan orientation and it is actually on the far side of the E-ticket show building from the water ride). If the queue is indeed on the same footprint as the boat ride, is it above or below the ride? Whether it is above or below, each would seem to have unnecessary problems.
Anyone who is better at reading these things want to comment?