Yes, there is sequencing based on material availability and lead times, but that is something that is tracked and planned. If a material is going to be delayed then the work schedule would be adjusted. Universal is currently ongoing with construction so supplies are not yet totally shut down.Probably can’t get a steady supply line of construction materials. Most materials arent just sitting around on a pallet, they are ordered and delivered with each phase, as needed. If I have to pay each construction worker $150/day, I don’t want to risk them showing up with no materials to work with.
Ok, I actually have no idea how construction work operates, but this seems like the logical process. Plus I’ve seen This Old House a few times