I didn't mean dig a tunnel...there is space between POTC and JC where a covered extended themed queue could be created above ground into the volcano structure over the portion of the rerouted JC and the railroad. IJA queue at DL only dips below ground to go under the railroad tracks, everything else is at ground level. At MK, the mountain would be over the railroad, so no need to go under them. The maintenance road could be rerouted around the base of the mountain. It would mainly be rerouting the JC to incorporate the mountain and still have access to the expansion pad southeast of Pirates.