South Florida Water Management District Permits
To access these go to this link and enter the application number listed below.
130703-8 - Typhoon Lagoon Entrance Road Modifications
130614-3 - Disney's Event Group Parking Lot Expansion
130215-8 - B V D Corridor Stormwater Project (Disney Springs)
121217-6 - A K Africa Hardscape Improvement (FotLK Theatre Move)
130725-16 - Osprey Ridge Golf Course Modifications
130614-6 - Typhoon Lagoon Laydown Area
130412-9 - Golden Oak Phase 2 B/2 C
130326-17 - Cast Parking Expansion And Access (North Service Area)
130307-8 - Harvest Energy Garden (Installation and operation of a new biogas-to-energy and fertilizer plant, adjacent to the Reedy Creek Wastewater Treatment Facility)
121221-32 - Magic Kingdom Bus Loop Expansion
121211-1 - Cast Parking Expansion
121023-11 - R C I D - S S A Compost Facility Modification
130729-2 - Polynesian Resort Rehabilitation
131210-6 - Disney Fourth Laundery Operation
2012 Permits
1/3/2013
BLIZZARD BEACH
Downhill Double Dipper Load/Unload - General
First Aid - Roofing
BOARDWALK
Boardwalk Bakery - Boardwalk Bakery Graphics
EPCOT
Innoventions East Outdoor Foods - General Construction
Norway Roof Work - Exterior Work
MAGIC KINGDOM
Disney Mk Pirates Adventure Graphics - Pirates Adventure Graphics
Main Street Bakery - Renovation
Monorail Station Roof Replacements - Roof Coating
TICKET AND TRANSPORATION CENTER
TTC Ferryboat Landing Roof Replacement - Roofing
TTC West Gate - Roofing
1/4/2013
ANIMAL KINGDOM
700 W Savannah Cir - DAK Character Landing FastPass Sign
1/7/2013
ANIMAL KINGDOM LODGE
Animal Kingdom Lodge - Provide labor, material and/or electrical for construction
BLIZZARD BEACH
Blizzard Beach - Provide labor, material and/or electrical for construction
BOARDWALK
Disney Boardwalk Flying Fish - Provide labor, material and/or electrical for construction
CONTEMPORARY
Contemporary - Provide labor, material and/or electrical for construction
DISNEY HOLLYWOOD STUDIO
DHS LMA Weight Room - Provide labor, material and/or electrical for construction
DOWNTOWN DISNEY
DTD PI Bus Loop - Provide labor, material and/or electrical for construction
EPCOT
Innoventions East - Stormstruck Post Office Wall Graphic
2002 Avenue of the Stars - Epcot Character Spot & Fastpass Graphics
GRAND FLORIDIAN
Gf Wedding Pavilion - Provide labor, material and/or electrical for construction
TYPHOON LAGOON
1195 E Buena Vista Dr - Typhoon Lagoon Entrance Road Signage Pkg
WILDERNESS LODGE
Wilderness Lodge - Provide labor, material and/or electrical for construction
YACHT CLUB
Yacht Club - Provide labor, material and/or electrical for construction
1/8/2013
Unknown - Emergency Repair Water Fountain
Unknown - Small Boiler
ADMIN
Storage Tank Rehab - Mechanical
ANIMAL KINGDOM
Bus Stop Expansion - New Bus Stop Structure: Concrete, Structural, Roofing, Electrical, Asphalt, Landscaping/Irrigation
BLIZZARD BEACH
Cast Services Building - Mechanical
CARRIBEAN BEACH RESORT
Shutters - General Construction
MAGIC KINGDOM
Switch Beams 1 and 2 - Structural Work
Liberty Square Bridge - Refurbish
Pirates Platform Steel Drum Stage - Refurbish
PORT ORLEANS FRENCH QUARTER
Comm Bldg - Food Court Show Kitchen - Mechanical
YATCH AND BEACH CLUB
Beaches and Cream - Mechanical
1/9/2013
ANIMAL KINGDOM
Elephant Barn - Install lifting beam for hydraulic cylinder @ door D
Elephant Barn - Install lifting beam for hydraulic cylinder @ door E
Elephant Barn - Install lifting beam for hydraulic cylinder @ door A
Elephant Barn - Install lifting beam for hydraulic cylinder @ door C
Avian Care Facility Phase 2 - Construction
DISNEY HOLLYWOOD STUDIO
Muppets 365 Cypress Drive Bay Lake Jfhs3028 - BVCC
Disney Jr - BVCC
Animation Building - Electrical
EPCOT
Journey to Imagination - BVCC
Turtle Talk - BVCC
Captain Eo - BVCC
Nemo And Friends 2020 Ave Of The Stars Bay Lake - BVCC
Front Entrance - Electrical
American Adventure Pavillion - Metal Work
American Adventure Pavillion - Metal Work
LAKE BUENA VISTA
Apartment building #8, #10, #11, #12, #13, #15, #16 - Contractors General Conditions
Apartment Building #10,#12,#13,#16,#18,#19,#21,#26,#28,#29,#31,#33 - Contractors General Conditions
1/10/2013
BLIZZARD BEACH
Entrance Road - Mill and Overlay
Bus Stop and Roadway - Mill & Overlay
BOARDWALK
Wadding Pool/Luna park pool resurfacing - Contractors General Conditions
Luna Park Pool Equipment Building - Contractors General Conditions
Main Pool Resurfacing - Contractors General Conditions
Luna Spa Resurfacing - Contractors General Conditions
CONTEMPORARY
Entrance and Exit Road - Mill and Overlay
DISNEY HOLLYWOOD STUDIO
Cypress Drive - Mill and Overlay
Parking Lot Entrance and Exit Road - Mill and Overlay
EPCOT
World Showcase Plaza Towers West Flower Bed - Concrete
Mission Space Pavilion - Icon Painting
ESPN
ESPNWWS Grill - General Construction
MAGIC KINGDOM
Pirates - Construction
MAIN ENTRANCE
Waterbridge to SevenSeas Drive - Mill and Overlay
Toll Plaza to Seven Seas Drive - Mill and Overlay
Floridian Way\World Drive Repaving - Mill and Overlay
POLYNESIAN
Bldgs 1 to 11 - Room Rehab
POP CENTURY
Century Drive - Mill and Overlay
1/11/2013
EPCOT
1442 Avenue of the Stars - Provide labor, material and/or electrical for construction
1/14/2013
BLIZZARD BEACH
Slush Gusher - BVCC
Snowless Joes - BVCC
Summit Plummet - BVCC
Teamboat Springs - BVCC
Double Dipper - BVCC
Toboggan Racers - BVCC
EPCOT
American Adventure - BVCC
MAGIC KINGDOM
Buzz Lightyear - BVCC
POP CENTURY
Pop Century - BVCC
1/14/2013
BLIZZARD BEACH
Slush Gusher - BVCC[/URL]
1/15/2013
ADMIN
Textile Services Administration - Mechanical
ALL STAR RESORTS
Cast Parking Lot - Rejuvenation
ANIMAL KINGDOM LODGE
Cast Parking Lot - Rejuvenation
BOARDWALK
Cast Parking Lot - Rejuvenation
CARRIBEAN BEACH RESORT
Aruba and Jamacia Bus Loops - Mill & Overlay
DOWNTOWN DISNEY
Once Upon a Toy Roof Replacements - Roofing
EPCOT
The Land Season's Soda room - Run air line to soda room
MAGIC KINGDOM
Splash/Pirates Service Lot - Mill and Overlay
MAIN ENTRANCE
Bus Wash - Mill and Overlay
POLYNESIAN
Luau Stage - Flooring Installation
POP CENTURY
Porte Cochere Paving - Mill and Overlay
PORT ORLEANS
Cast Parking Lot - Rejuvenation
Cast Parking Lot - Rejuvenation
YATCH AND BEACH CLUB
Stormalong Bay Bridges - Contractors General Conditions
1/16/2013
ART OF ANIMATION RESORT
Disney Daar - BVCC
BLIZZARD BEACH
Disney Blizzard Beach Turnstiles - BVCC
DISNEY HOLLYWOOD STUDIO
Dhs Tower Of Terror - BVCC
Dhs American Idol - BVCC
Dhs Disney Jr - BVCC
Disney Dhs Tower Of Terror - BVCC
1/17/2013
MAGIC KINGDOM
Country Bear Jamboree - General Construction
ANIMAL KINGDOM
Animal Programs Admin Building - Construction
BLIZZARD BEACH
Lottawatta Lodge - Equipment Installation
DOWNTOWN DISNEY
Preview Center 3rd Floor - Telecommunications Installation
SARATOGA SPRINGS RESORT
Saratoga Springs - Spa Refurbishment
1/22/2013
ANIMAL KINGDOM
Kilimanjaro - BVCC
BLIZZARD BEACH
Blizzard Beach - BVCC
Tikes Peak - Repairs
CARRIBEAN BEACH RESORT
Caribbean Beach Resort - Finishes
DISNEY HOLLYWOOD STUDIO
Toy Story - BVCC
Great Movie Ride - BVCC
Little Mermaid - BVCC
Star Tours - BVCC
EPCOT
Ec International Gateway - BVCC
GRAND FLORIDIAN/Polynsesian
Grand Floridan and Polynesian - General Construction (Monorail Entrance Gate Updates)
HILTON
Hilton at WDW - Pool Deck Renovations
MAGIC KINGDOM
Launching Pad - BVCC
Mo3 - BVCC
Philharmagic - BVCC
Monsters Inc - BVCC
Tomorrowland Speedway - BVCC
Mk Mo2 - BVCC
Mad Tea Party - Refurbishment
4548, 4875, 4835, 4849, 4873 Caribbean Way - Experience Development - PIRIM AV/SC Package
PORT ORLEANS
Magnolia Bend Building 9500, 90, 80, 85, Alligator Bayou 34-39, 24-28, 14-18 - Mechanical
PORT ORLEANS FRENCH QUARTER
French Quarter - Finishes
1/24/2013
ADMIN
Laundry Facility Equipment Install - General Construction
DISNEY HOLLYWOOD STUDIO
Lights Motors Action Grandstand - Wall rehab
GRAND FLORIDIAN
Main Building - Mechanical
MAGIC KINGDOM
Splash Mountain - Electrical
1/25/2013
LAKE BUENA VISTA
Bvd Stormwater Preview Center - Audio Visual Installation
PORT ORLEANS RIVERSIDE
Ol' Man Island Heater Replacement - Mechanical
1/29/2013
BLIZZARD BEACH
Handrail Projects - General Construction
Handrail Project - General Construction
MAGIC KINGDOM
Main Street Front Entrance Rehab - Electrical
OVERALL
Bay Court - General Construction
1/30/2013
MAGIC KINGDOM
Aladdin - Aladdin Canopy
Seven Dwarfs Mine Train - Seven Dwarfs Mine Train Show Set
Columbia Harbour House - Columbia Harbour House Menu Shrouds
1/31/2013
ANIMAL KINGDOM
FOLK Fastpass+ - Site Work
Theater in the Wild Fastpass+ - Site Work
Dino Institute Gift Shop, Serka Zong Bazaar, Garden Gate Gifts, Disney Outfitters - Electrical
BLIZZARD BEACH
Tikes Peak - Repairs
DISNEY HOLLYWOOD STUDIO
Legends of Hollywood - Electrical
MAGIC KINGDOM
Magic Kingdom - Ferry Boat Marquee Removal
Disney Fourth Laundery Operation
To access these go to this link and enter the application number listed below.
130703-8 - Typhoon Lagoon Entrance Road Modifications
130614-3 - Disney's Event Group Parking Lot Expansion
130215-8 - B V D Corridor Stormwater Project (Disney Springs)
121217-6 - A K Africa Hardscape Improvement (FotLK Theatre Move)
130725-16 - Osprey Ridge Golf Course Modifications
130614-6 - Typhoon Lagoon Laydown Area
130412-9 - Golden Oak Phase 2 B/2 C
130326-17 - Cast Parking Expansion And Access (North Service Area)
130307-8 - Harvest Energy Garden (Installation and operation of a new biogas-to-energy and fertilizer plant, adjacent to the Reedy Creek Wastewater Treatment Facility)
121221-32 - Magic Kingdom Bus Loop Expansion
121211-1 - Cast Parking Expansion
121023-11 - R C I D - S S A Compost Facility Modification
130729-2 - Polynesian Resort Rehabilitation
131210-6 - Disney Fourth Laundery Operation
2012 Permits
1/3/2013
BLIZZARD BEACH
Downhill Double Dipper Load/Unload - General
First Aid - Roofing
BOARDWALK
Boardwalk Bakery - Boardwalk Bakery Graphics
EPCOT
Innoventions East Outdoor Foods - General Construction
Norway Roof Work - Exterior Work
MAGIC KINGDOM
Disney Mk Pirates Adventure Graphics - Pirates Adventure Graphics
Main Street Bakery - Renovation
Monorail Station Roof Replacements - Roof Coating
TICKET AND TRANSPORATION CENTER
TTC Ferryboat Landing Roof Replacement - Roofing
TTC West Gate - Roofing
1/4/2013
ANIMAL KINGDOM
700 W Savannah Cir - DAK Character Landing FastPass Sign
1/7/2013
ANIMAL KINGDOM LODGE
Animal Kingdom Lodge - Provide labor, material and/or electrical for construction
BLIZZARD BEACH
Blizzard Beach - Provide labor, material and/or electrical for construction
BOARDWALK
Disney Boardwalk Flying Fish - Provide labor, material and/or electrical for construction
CONTEMPORARY
Contemporary - Provide labor, material and/or electrical for construction
DISNEY HOLLYWOOD STUDIO
DHS LMA Weight Room - Provide labor, material and/or electrical for construction
DOWNTOWN DISNEY
DTD PI Bus Loop - Provide labor, material and/or electrical for construction
EPCOT
Innoventions East - Stormstruck Post Office Wall Graphic
2002 Avenue of the Stars - Epcot Character Spot & Fastpass Graphics
GRAND FLORIDIAN
Gf Wedding Pavilion - Provide labor, material and/or electrical for construction
TYPHOON LAGOON
1195 E Buena Vista Dr - Typhoon Lagoon Entrance Road Signage Pkg
WILDERNESS LODGE
Wilderness Lodge - Provide labor, material and/or electrical for construction
YACHT CLUB
Yacht Club - Provide labor, material and/or electrical for construction
1/8/2013
Unknown - Emergency Repair Water Fountain
Unknown - Small Boiler
ADMIN
Storage Tank Rehab - Mechanical
ANIMAL KINGDOM
Bus Stop Expansion - New Bus Stop Structure: Concrete, Structural, Roofing, Electrical, Asphalt, Landscaping/Irrigation
BLIZZARD BEACH
Cast Services Building - Mechanical
CARRIBEAN BEACH RESORT
Shutters - General Construction
MAGIC KINGDOM
Switch Beams 1 and 2 - Structural Work
Liberty Square Bridge - Refurbish
Pirates Platform Steel Drum Stage - Refurbish
PORT ORLEANS FRENCH QUARTER
Comm Bldg - Food Court Show Kitchen - Mechanical
YATCH AND BEACH CLUB
Beaches and Cream - Mechanical
1/9/2013
ANIMAL KINGDOM
Elephant Barn - Install lifting beam for hydraulic cylinder @ door D
Elephant Barn - Install lifting beam for hydraulic cylinder @ door E
Elephant Barn - Install lifting beam for hydraulic cylinder @ door A
Elephant Barn - Install lifting beam for hydraulic cylinder @ door C
Avian Care Facility Phase 2 - Construction
DISNEY HOLLYWOOD STUDIO
Muppets 365 Cypress Drive Bay Lake Jfhs3028 - BVCC
Disney Jr - BVCC
Animation Building - Electrical
EPCOT
Journey to Imagination - BVCC
Turtle Talk - BVCC
Captain Eo - BVCC
Nemo And Friends 2020 Ave Of The Stars Bay Lake - BVCC
Front Entrance - Electrical
American Adventure Pavillion - Metal Work
American Adventure Pavillion - Metal Work
LAKE BUENA VISTA
Apartment building #8, #10, #11, #12, #13, #15, #16 - Contractors General Conditions
Apartment Building #10,#12,#13,#16,#18,#19,#21,#26,#28,#29,#31,#33 - Contractors General Conditions
1/10/2013
BLIZZARD BEACH
Entrance Road - Mill and Overlay
Bus Stop and Roadway - Mill & Overlay
BOARDWALK
Wadding Pool/Luna park pool resurfacing - Contractors General Conditions
Luna Park Pool Equipment Building - Contractors General Conditions
Main Pool Resurfacing - Contractors General Conditions
Luna Spa Resurfacing - Contractors General Conditions
CONTEMPORARY
Entrance and Exit Road - Mill and Overlay
DISNEY HOLLYWOOD STUDIO
Cypress Drive - Mill and Overlay
Parking Lot Entrance and Exit Road - Mill and Overlay
EPCOT
World Showcase Plaza Towers West Flower Bed - Concrete
Mission Space Pavilion - Icon Painting
ESPN
ESPNWWS Grill - General Construction
MAGIC KINGDOM
Pirates - Construction
MAIN ENTRANCE
Waterbridge to SevenSeas Drive - Mill and Overlay
Toll Plaza to Seven Seas Drive - Mill and Overlay
Floridian Way\World Drive Repaving - Mill and Overlay
POLYNESIAN
Bldgs 1 to 11 - Room Rehab
POP CENTURY
Century Drive - Mill and Overlay
1/11/2013
EPCOT
1442 Avenue of the Stars - Provide labor, material and/or electrical for construction
1/14/2013
BLIZZARD BEACH
Slush Gusher - BVCC
Snowless Joes - BVCC
Summit Plummet - BVCC
Teamboat Springs - BVCC
Double Dipper - BVCC
Toboggan Racers - BVCC
EPCOT
American Adventure - BVCC
MAGIC KINGDOM
Buzz Lightyear - BVCC
POP CENTURY
Pop Century - BVCC
1/14/2013
BLIZZARD BEACH
Slush Gusher - BVCC[/URL]
1/15/2013
ADMIN
Textile Services Administration - Mechanical
ALL STAR RESORTS
Cast Parking Lot - Rejuvenation
ANIMAL KINGDOM LODGE
Cast Parking Lot - Rejuvenation
BOARDWALK
Cast Parking Lot - Rejuvenation
CARRIBEAN BEACH RESORT
Aruba and Jamacia Bus Loops - Mill & Overlay
DOWNTOWN DISNEY
Once Upon a Toy Roof Replacements - Roofing
EPCOT
The Land Season's Soda room - Run air line to soda room
MAGIC KINGDOM
Splash/Pirates Service Lot - Mill and Overlay
MAIN ENTRANCE
Bus Wash - Mill and Overlay
POLYNESIAN
Luau Stage - Flooring Installation
POP CENTURY
Porte Cochere Paving - Mill and Overlay
PORT ORLEANS
Cast Parking Lot - Rejuvenation
Cast Parking Lot - Rejuvenation
YATCH AND BEACH CLUB
Stormalong Bay Bridges - Contractors General Conditions
1/16/2013
ART OF ANIMATION RESORT
Disney Daar - BVCC
BLIZZARD BEACH
Disney Blizzard Beach Turnstiles - BVCC
DISNEY HOLLYWOOD STUDIO
Dhs Tower Of Terror - BVCC
Dhs American Idol - BVCC
Dhs Disney Jr - BVCC
Disney Dhs Tower Of Terror - BVCC
1/17/2013
MAGIC KINGDOM
Country Bear Jamboree - General Construction
ANIMAL KINGDOM
Animal Programs Admin Building - Construction
BLIZZARD BEACH
Lottawatta Lodge - Equipment Installation
DOWNTOWN DISNEY
Preview Center 3rd Floor - Telecommunications Installation
SARATOGA SPRINGS RESORT
Saratoga Springs - Spa Refurbishment
1/22/2013
ANIMAL KINGDOM
Kilimanjaro - BVCC
BLIZZARD BEACH
Blizzard Beach - BVCC
Tikes Peak - Repairs
CARRIBEAN BEACH RESORT
Caribbean Beach Resort - Finishes
DISNEY HOLLYWOOD STUDIO
Toy Story - BVCC
Great Movie Ride - BVCC
Little Mermaid - BVCC
Star Tours - BVCC
EPCOT
Ec International Gateway - BVCC
GRAND FLORIDIAN/Polynsesian
Grand Floridan and Polynesian - General Construction (Monorail Entrance Gate Updates)
HILTON
Hilton at WDW - Pool Deck Renovations
MAGIC KINGDOM
Launching Pad - BVCC
Mo3 - BVCC
Philharmagic - BVCC
Monsters Inc - BVCC
Tomorrowland Speedway - BVCC
Mk Mo2 - BVCC
Mad Tea Party - Refurbishment
4548, 4875, 4835, 4849, 4873 Caribbean Way - Experience Development - PIRIM AV/SC Package
PORT ORLEANS
Magnolia Bend Building 9500, 90, 80, 85, Alligator Bayou 34-39, 24-28, 14-18 - Mechanical
PORT ORLEANS FRENCH QUARTER
French Quarter - Finishes
1/24/2013
ADMIN
Laundry Facility Equipment Install - General Construction
DISNEY HOLLYWOOD STUDIO
Lights Motors Action Grandstand - Wall rehab
GRAND FLORIDIAN
Main Building - Mechanical
MAGIC KINGDOM
Splash Mountain - Electrical
1/25/2013
LAKE BUENA VISTA
Bvd Stormwater Preview Center - Audio Visual Installation
PORT ORLEANS RIVERSIDE
Ol' Man Island Heater Replacement - Mechanical
1/29/2013
BLIZZARD BEACH
Handrail Projects - General Construction
Handrail Project - General Construction
MAGIC KINGDOM
Main Street Front Entrance Rehab - Electrical
OVERALL
Bay Court - General Construction
1/30/2013
MAGIC KINGDOM
Aladdin - Aladdin Canopy
Seven Dwarfs Mine Train - Seven Dwarfs Mine Train Show Set
Columbia Harbour House - Columbia Harbour House Menu Shrouds
1/31/2013
ANIMAL KINGDOM
FOLK Fastpass+ - Site Work
Theater in the Wild Fastpass+ - Site Work
Dino Institute Gift Shop, Serka Zong Bazaar, Garden Gate Gifts, Disney Outfitters - Electrical
BLIZZARD BEACH
Tikes Peak - Repairs
DISNEY HOLLYWOOD STUDIO
Legends of Hollywood - Electrical
MAGIC KINGDOM
Magic Kingdom - Ferry Boat Marquee Removal
Disney Fourth Laundery Operation
Last edited: