Walt d
Well-Known Member
Now thats a e ticket ride”Toy Story Land expansion announced for Disney's Hollywood Studios.
Family coaster part of the plans.
Now thats a e ticket ride”Toy Story Land expansion announced for Disney's Hollywood Studios.
Family coaster part of the plans.
It looks pretty much the same to me.
The structure on the left with the open lid in the construction picture is the structure on the right with the open lid in the artwork. The structure on the right in the construction picture is not pictured in the concept art.Structure on the right has the open lid, one on the left doesn't...
View attachment 264595
Structure on the left has the open lid detail, structure on the right doesn't
View attachment 264596
The structure on the left with the open lid in the construction picture is the structure on the right with the open lid in the artwork. The structure on the right in the construction picture is not pictured in the concept art.
The marquee entrance seen on the left in the artwork is not yet installed. It is more of a sign/prop than an actual building.
I know it's still just in testing but I swear it's going slower than what I would assume is it's intended speed. IDK.
That’s standard Mack track. Intamin’s standard track looks similar, giga or not.yes, i thought it would have a bit more zip. i wasn't expecting thrill ride but why did they have to use such a gigacoaster-like structure for such a tame ride? durability?
7DMT tops at 34 mph. Do we really think SDD will be slower?After seeing that slow video- you have to reconsider this now, right? You gave me some serious flack for saying it would be the slowest launch coaster out there at 25-30mph and a height requirement at or under 40” - like Fire chaser
You know what? Maybe the whole world is underwhelming pal...Pretty underwhelming.
Really looks tame...I mean, remove the slinky/toy story theming and it looks like a generic coaster you'd expect to see at a pop-up carnival/funfair. Pretty underwhelming.
yes, i thought it would have a bit more zip. i wasn't expecting thrill ride but why did they have to use such a gigacoaster-like structure for such a tame ride? durability?
2 months shy of 3 years from announcement to Grand Opening for a flat and a Jr. coaster.
Good to see TDO is aggressively addressing the capacity issues of this sad little park.
Wow! Finally someone with a working brain cell and reality based logic.Although I am disappointed about the speed of Slinky dog, I do realize that one of the complaints about the studios was the lack of family friendly rides. So I guess this new land will satisfy that demographic.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.