Captain Barbossa
Well-Known Member
She was out testing yesterday too. I imagine we’ll see Roy testing next week.
She was out testing yesterday too. I imagine we’ll see Roy testing next week.
Yes, 3 trains would often run on busy days.I take it we need to see two trains test running at same time doing circuits at some point soon…has there been three at a time? Been a while…
I would like to see the Speedway be on land that is multi purpose. Integrate some flat rides or a roller coaster around it. Toy Story Land was the perfect opportunity to do both. TRON was also an opportunity to do this.The Hong Kong Disneyland speedway had small set pieces and they did some very unusual landscaping to make it feel more futuristic and other-worldly...now that WDW's speedway has been reduced to it's smallest footprint, it would be great to see them at least make it a "jewel Box" attraction and set-dress and detail it to be a must-see even for those that have outgrown it... If they are taking up that much real estate, it should be much nicer than it is...
By or before? At this point it doesn’t really make much of a difference to me, as long as we get it this year I’m happyIt was reiterated to me today that they still plan to reopen the WDWRR by Christmas. I presume we will see movement in terms of staffing soon.
I wouldn’t expect them to be testing it if they don’t plan on opening soon. How long does it take to schedule and train the station and conductors? 2 weeks tops?It was reiterated to me today that they still plan to reopen the WDWRR by Christmas. I presume we will see movement in terms of staffing soon.
The magic eight ball sez noWill the WDW Railroad have to close again due to the Splash Mountain re-theme when it opens again?
Idk.... The whole tram fiasco seems to say otherwise.I wouldn’t expect them to be testing it if they don’t plan on opening soon. How long does it take to schedule and train the station and conductors? 2 weeks tops?
The tram thing is really bad! They are choosing to save money over the guest experience.Idk.... The whole tram fiasco seems to say otherwise.
They started hiring for trains a while ago.It was reiterated to me today that they still plan to reopen the WDWRR by Christmas. I presume we will see movement in terms of staffing soon.
Has training begun for all roles yet? They’ll need to start training the CMs who will be in the stations.They started hiring for trains a while ago.
If the wheels were just left to keep spinning that’s terrible for the locomotives and the track and it can be very dangerous.I just saw a horrendous video of Lily pulling out of the Fantasyland station. If you don’t know, there’s a grade pulling out of there and it can be somewhat difficult to pull out if that station, especially with a train full of guests. If the engineer isn’t skilled, then the wheels will just keep spinning and the train will barely move. This is what happened in that video. It doesn’t reflect well on their training and it can be harmful to the locomotives.
I’m not completely sure on that front.Has training begun for all roles yet? They’ll need to start training the CMs who will be in the stations.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.