agreed, i was about to say the same thing, but maybe they can since its 2,000 spaces so can be more of a standardized design versus the larger garages
i wonder what kind of time difference we will see for construction in the difference between cast in place and pre-cast
Perhaps and maybe won't have as unique ramps etc. Precast's do fly up so this should be pretty quick and may have been part of the decision. They know they need the spaces. I do wonder if all of the parking space finding technology will be absent. The cast in place allowed hiding all of that wiring and infrastructure. Almost hope they don't include it as it will be medal conduit central.