Read this from Westsider from the site we dont speak of... Rat Talk. A lot of it is regarding concerns that many have shared on the topic of SWL capacity/ operations but I believe he has a good rep/ some inside info and goes into a bit more detail.
"Management is already having a difficult time getting people to apply to go to GE. They need hundreds of CM's just for attractions, but very few people applied. The problem is that the Test and Adjust crew has been there for a year now, and they know all the problems the rides will face. Management also had a hard time getting quality candidates to fill the middle managers and front line management spots, and TDA filled the management teams with some very inexperienced candidates. There are respected DL managers with decades of experience who said "No way in heck!" would they go to GE, and that has filtered down to the hourly CM's with seniority too. The smart CM's are staying away.
The whole concept is going to be a nightmare and there will be a lot of associated problems to deal with. The capacity of both rides is way too low. Millenium Falcon gets 1800 an hour with all four turntables running with every seat filled, even though only two of the six seats are the "pilot" positions and everyone is going to want to be the pilot instead of a dumb helper in the back row. The ROTR ride is closer to 1500 an hour, and that's assuming the thing works. There are multiple ride systems in ROTR, if one ride system stops or faults, the entire thing is closed. Right now they can't get the entire ride to work for more than 15 minutes at a time without stopping for hours to reset and fix.
People who have seen the stores and dining are alarmed at how small and cramped things are, especially the much hyped Cantina. The Cantina has a half dozen small booths, and one dozen bar stools to sit at, that's it. There will be standing space, but not a lot. You can't fit more than 100 people in the Cantina at a time. If you average a 30 minute visit, that would be 3,000 people per day who could visit the Cantina. Disneyland already easily gets 60,000 people per day. Do you wanna be the guy who has to tell 57,000 people they can't get in each day?
There is a fast food location, think a Batuu version of Boardwalk Pizza n Pasta over at DCA, and several small ODV type carts that are highly themed. That's it for dining in the land.
The hyping and opening of GE could ruin Disneyland for years to come. More and more CM's are really starting to worry what it will mean for their ride or location even if they don't transfer to GE."