General Grizz
New Member
Methinks we in Orlando need to recruit a Mr. Matt O. after the DL celebration...Lee said:Nah...nothing is being skimped on as far as details. If the weather holds up, the construction doesn't hit any snags, the test and adjust goes well (ride and effects), then MAYBE a late 2005 opening will be possible.
Heck...if they turn on the money faucet (like Matt O. did for Space Mtn. at Disneyland) it could open in Fall...just kidding. :lol: