fngoofy
Well-Known Member
It elongated the stand-by queue while shortening the Fastpass queue meaning that they can fit more people inside the building as they wait. The two queues used to be roughly the same length to make it fair for everyone, but with the change in distribution of guests they had to change the proportions of line.
Merge is there because you have to have a merge for Fastpass and it's not like they could just take out one loading dock and funnel both lines into one for a true merge, nor could they starve one side if there is no Fastpass demand because capacity would basically be halved.
Thank you, well said.