They could just use a bigger crane to get the crane out.
I think now even the most cynical can see why some were so optimistic when this plan was announced.
That is quite the scrim around Yankee Traders. I still think there is still the possibility of a m&g. There is space.
I can't wait to see the MK circa 2021. I am sure I will get back there by then.
Wow, it really seems like they are getting down to business with the SDMT, really accelerating (of course it has been a while since I last saw aerials).
The new pavement is either really well done or still dirt from construction. Can't tell where it starts/ends. Are the brown areas surrounding the exposed castle wall just themed pavement or was this pulled up?
Also, I'd love to see how they are going to get that crane out. I guess it will go under that extension by LM or something.
I think the area around the walls is themed pavement, just not sure why it looks so much darker in this aerial then it does from the ground pictures. Maybe it's wet in the aerial picture. If it was torn up they would have a construction wall around it.
As for the path by Aerial I am still not sure if that is dirt or themed concrete. Really hard to tell.
Check out this photo. I took it straight from Scott's sight. (better quality and more zoom-in-able)I think the area around the walls is themed pavement, just not sure why it looks so much darker in this aerial then it does from the ground pictures. Maybe it's wet in the aerial picture. If it was torn up they would have a construction wall around it.
As for the path by Aerial I am still not sure if that is dirt or themed concrete. Really hard to tell.
Here is a markup of the Mine Ride track that I did using Scott Keating's latest aerial and a track layout that has been posted here. Most of the foundations for the left side are in place so that should be pretty accurate. Right side foundations appear to still be in the works so that side might be a little off.Red is outdoor track, yellow is indoor.
Here is a markup of the Mine Ride track that I did using Scott Keating's latest aerial and a track layout that has been posted here. Most of the foundations for the left side are in place so that should be pretty accurate. Right side foundations appear to still be in the works so that side might be a little off.Red is outdoor track, yellow is indoor.
Verrryy close. the 1st 3rd and 4rth turns are just going to be a little bit wider and longer and will into were the current dirt construction road is. If you look both at the model and pics looking south at the section by tea cups you’ll see the ride track is a good story below that current path and has rock work to show a cliff.
SDMT still won't open until 2014 even though they've got that much done already? I know the FL project is slow, but that still seems to be a stretch looking at that.
SDMT still won't open until 2014 even though they've got that much done already? I know the FL project is slow, but that still seems to be a stretch looking at that.
I think I see what he is looking at, I have highlighted it in red...
I think you've outlined the back walls of the buildings, there seems to be a large concrete rectangle between the red lines and the yellow barriers that is probably the front edge of the buildings
I think the red line is going to be the front edge of the buildings, since it seems to pretty closely match the front of the buildings in the model.
New TomorrowlandWhat is everyone going to concentrate on when this project is done?