OK, I followed a link given in another thread about the upcoming RnRC rehab, and the discussion about them adding a single rider line. The link was to the Orange County Official Records. Doing a few searches I found a few things of note: (Or at least a few things that SOMEONE might be interested in)
-During Typhoon Lagoon's rehab, at least one bridge and stairway at the Shark Reef will be demolished and rebuilt:
http://officialrecords.occompt.com/...id=28517116&file_num=20060759434&doc_status=I
-The long-unused FastPass machines are finally being removed at the Haunted Mansion.
http://officialrecords.occompt.com/...id=28512008&file_num=20060754700&doc_status=V
-The windows of the Spaceship Earth VIP Lounge are being replaced:
http://officialrecords.occompt.com/...id=28512016&file_num=20060754708&doc_status=V
-The Main Entrance PI Ticket booths aren't going anywhere, they're getting rotten wood replaced.
http://officialrecords.occompt.com/...id=28507834&file_num=20060750855&doc_status=V
-The upcoming El Rio del Tiempo refurb will entail the replacement of the ride control consoles, intrusion system in the ride, PA system upgrades and adding gates to the platform.
http://officialrecords.occompt.com/...id=28507831&file_num=20060750852&doc_status=V
-It appears that a second Turtle Talk theater is on the way. There's a filing for installation of HVAC equipment for "Turtle Talk II".
http://officialrecords.occompt.com/...id=28505737&file_num=20060748870&doc_status=V
-Further proof of the "construction trailer compound" at the STOLPORT for the Contemporary.
http://officialrecords.occompt.com/...id=28495679&file_num=20060739422&doc_status=V
And that's just things filed in November!
-Rob
-During Typhoon Lagoon's rehab, at least one bridge and stairway at the Shark Reef will be demolished and rebuilt:
http://officialrecords.occompt.com/...id=28517116&file_num=20060759434&doc_status=I
-The long-unused FastPass machines are finally being removed at the Haunted Mansion.
http://officialrecords.occompt.com/...id=28512008&file_num=20060754700&doc_status=V
-The windows of the Spaceship Earth VIP Lounge are being replaced:
http://officialrecords.occompt.com/...id=28512016&file_num=20060754708&doc_status=V
-The Main Entrance PI Ticket booths aren't going anywhere, they're getting rotten wood replaced.
http://officialrecords.occompt.com/...id=28507834&file_num=20060750855&doc_status=V
-The upcoming El Rio del Tiempo refurb will entail the replacement of the ride control consoles, intrusion system in the ride, PA system upgrades and adding gates to the platform.
http://officialrecords.occompt.com/...id=28507831&file_num=20060750852&doc_status=V
-It appears that a second Turtle Talk theater is on the way. There's a filing for installation of HVAC equipment for "Turtle Talk II".
http://officialrecords.occompt.com/...id=28505737&file_num=20060748870&doc_status=V
-Further proof of the "construction trailer compound" at the STOLPORT for the Contemporary.
http://officialrecords.occompt.com/...id=28495679&file_num=20060739422&doc_status=V
And that's just things filed in November!
-Rob