Hello, I visited Magic Kingdom today, And I have some pictures to share with everyone
First, Before the Magic Kingdom Pictures, I visited the Casting Center for a 1:00pm Interview, and go back February 1st at 1:00pm for my 2nd Appointment for being a New Cast Member, I will be working Quick Service for Epcot's Flower and Garden Festival this year.
Now Onto The Kingdom of Dreams
Sleepy Hallow has some Walls and a Tarp on it now.
Tarps around the Adventureland Vendura(?, Someone correct me if Im Wrong)
I think this is what Lee was hinting at when he said Explosive when referring to BTMRR
(Look upper right)
I didnt snap a Picture of it, But also, In the 2nd Maze room in BTMRR, There was a Dynamite Lever to Push down, And in the Picture, The new sets on the Mountain looked as if something would be explosive.
On Splash Mountain, They have a decent amount of rockwork removed on the Big Drop
The Fanciest Lavatory ever made (Tangled Restroom)
Nothing new with Seven Drawfs Mine Ride today, Except the Backside facing Mermaid
Speaking of Mermaid, I remember these set of fish not moving in The Little Mermaid Ride back on New Years, and they have yet to be fixed..
Some Path Work next to Poohs Thoughtful Shop, Castlewall
Also, I dont have a picture, but to the left of Gate 8 on The Barnstormer, There is some walls with Flooring Work going on.
Over at Disneys Contemporary Resort, There was some construction on the Fire Exit Staircase on the Bay Lake Tower/MK side
And here are some bonus shots, The View from the Top of The Contemporary
Looking toward I-Drive/Peabody Hotel
Looking toward DTD
Looking towards Epcot/Swan and Dolphin
And heres The Magic Kingdom
That is all I have today, Until Next Time, Stay Strong WDWMAGIC Posters
First, Before the Magic Kingdom Pictures, I visited the Casting Center for a 1:00pm Interview, and go back February 1st at 1:00pm for my 2nd Appointment for being a New Cast Member, I will be working Quick Service for Epcot's Flower and Garden Festival this year.
Now Onto The Kingdom of Dreams
Sleepy Hallow has some Walls and a Tarp on it now.
Tarps around the Adventureland Vendura(?, Someone correct me if Im Wrong)
I think this is what Lee was hinting at when he said Explosive when referring to BTMRR
(Look upper right)
I didnt snap a Picture of it, But also, In the 2nd Maze room in BTMRR, There was a Dynamite Lever to Push down, And in the Picture, The new sets on the Mountain looked as if something would be explosive.
On Splash Mountain, They have a decent amount of rockwork removed on the Big Drop
The Fanciest Lavatory ever made (Tangled Restroom)
Nothing new with Seven Drawfs Mine Ride today, Except the Backside facing Mermaid
Speaking of Mermaid, I remember these set of fish not moving in The Little Mermaid Ride back on New Years, and they have yet to be fixed..
Some Path Work next to Poohs Thoughtful Shop, Castlewall
Also, I dont have a picture, but to the left of Gate 8 on The Barnstormer, There is some walls with Flooring Work going on.
Over at Disneys Contemporary Resort, There was some construction on the Fire Exit Staircase on the Bay Lake Tower/MK side
And here are some bonus shots, The View from the Top of The Contemporary
Looking toward I-Drive/Peabody Hotel
Looking toward DTD
Looking towards Epcot/Swan and Dolphin
And heres The Magic Kingdom
That is all I have today, Until Next Time, Stay Strong WDWMAGIC Posters