When I was at IOA yesterday, I noticed that major work was being done on McBean.
- All track appeared to be ripped out of Circus McGurkus. The track that connects it with the loading area was definately gone.
- In all interior areas, the ceiling was ripped apart. Either the vehicles are going to be taller, or the ride will now be suspended.
- In the very back, in what appeared to be a maintainence bay, I saw overhead yellow track at the open end of the building. Maybe that's how the vehicles are transported?
The only thing that makes me think otherwise is that they want to open the ride this year. Converting the entire ride from a standard track to an overhead track would take quite a bit of time.
However, since the ride system hasn't been confirmed by anyone, it's really anybody's guess.
Thoughts?
Thoughts?
When I was at IOA yesterday, I noticed that major work was being done on McBean.
- All track appeared to be ripped out of Circus McGurkus. The track that connects it with the loading area was definately gone.
- In all interior areas, the ceiling was ripped apart. Either the vehicles are going to be taller, or the ride will now be suspended.
- In the very back, in what appeared to be a maintainence bay, I saw overhead yellow track at the open end of the building. Maybe that's how the vehicles are transported?
The only thing that makes me think otherwise is that they want to open the ride this year. Converting the entire ride from a standard track to an overhead track would take quite a bit of time.
However, since the ride system hasn't been confirmed by anyone, it's really anybody's guess.
Thoughts?