No. They are reconfiguring the parking tram load zones and security screening areas. This also includes guest flow around these areas as well as guest flow out into the parking areas. At the same time they are using this time to also remove the “Walk Around the World” stones that guests bought in the mid-1990’s. Both at TTC as well as MK entrance areas, etc.Are they planning on tearing down the TTC completely ??
No. They are reconfiguring the parking tram load zones and security screening areas. This also includes guest flow around these areas as well as guest flow out into the parking areas. At the same time they are using this time to also remove the “Walk Around the World” stones that guests bought in the mid-1990’s. Both at TTC as well as MK entrance areas, etc.
Yes I know right. Eventually all the walkway stones around the lagoon will be removed.Somewhat ironic those get removed just as Disney (finally) moves ahead with a new pedestrian bridge between the GF and MK, literally bridging the most difficult gap in the original plan to have a walkway of bricks around Seven Seas Lagoon.
I thought those new sheltere were for tram loadingPhoto update as of Friday, July 19, 2019. At the Transportation & Ticket Center, the pavement between the covered bag check area (on the right) and the ticket kiosks (off to the left) are mostly gone. You might recall the water fountain in the photo between the two.
View attachment 391496
View attachment 391497
Remember all those engraved tile pavers in the pavement? Here they are....all in a pile....
View attachment 391495
The shelters that used to be tram load/unload are now security screening. Then they pushed tram load/unload out into the tram lanes with no shelters for the past year or two. The other shelters you are thinking of are for the Ticket Booth queues.I thought those new sheltere were for tram loading
As I thought security was a bit further back under the previously existing canopy
If the new ones are for security then were is tram load and unload going to be,
I don’t think they will have shade. For past year or two, TTC has not had shade for the temporary tram load/unload. AK never had shade structure nor did DHS. New DHS doesn’t have it either. Epcot is lost theirs with this new refurb along with TTC. I hope they come back, they are not that hard to add after the fact. But given current Mgmt I don’t think we are getting them back.So the big question....will people be exiting the trams at the TTC with no shade/cover when it rains, because that's a PITA
So now that they are doing this, will they now begin selling 50th Anniversary pavers? A second chance at a cash grab to pay for the refurbished areas?
Walls/fences are up and some of the sidewalks are being torn up.What's the status of the Animal Kingdom entrance?