Loops vary wildly from 30 to 75ish cabins. It's a hunch but I'd bet on loop 2500 first because it's small (about 33 cabins), near the pool, and across from the bus stop. I'd guess they'll knock them out smallest to largest from there, so then 2300, 2200, etc clockwise. The smaller the faster it can be put online.That’s interesting. They need 30 done by opening day so that DVC members get a new cabin when they book. How many cabins are in each loop?
I read it was batches of around 6-10 cabins being swapped in and connected to utilities, taking around 18 months to swap them all out. You’re saying half the time. Not that I heard from official sources so maybe someone had just got their timeline mixed up.
What time period is the 6-10? If it's average per week then 8 per week would take about 51 weeks to do all.