Photo update as of Friday, June 2. I copied the below photo from a previous post to orient viewers to my new photos. This forested area is bounded by a construction fence along Studio Drive North and the pedestrian walkway along the canal. The red areas have been cleared of trees and are shown in the new photos below.
View attachment 208009
This is the view from the pedestrian walkway (along the canal) towards Studio Drive North. A wide swath of trees is being removed that parallels Buena Vista Drive. In the background, you can see a white pickup parked on the shoulder of Studio Drive North. It appears the tree line on the left will remain and be the "buffer" along Buena Vista Drive.
View attachment 208006
Along the pedestrian pathway, the red circle shows the start of the cleared area that parallels Buena Vista Drive (see bridge in left background) where the trees have been removed. In addition, some clearing has taken place just behind this fence, along the fence line.
View attachment 208007
A view of the clearing behind the fence line.
View attachment 208008