News Center Street on Magic Kingdom's Main Street U.S.A. partially closed for refurbishment work

SplashJacket

Well-Known Member
BC546C21-406E-419F-B59F-33BC8840E09B.jpeg
 

roj2323

Well-Known Member
The slow progress is likely due to the large amounts of rain the area has been seeing over the last 2-3 weeks. It's raining literally every night at around 9-10pm for over an hour and this type of fake brick doesn't adhere properly to the surface material when it's wet or full of moisture. If we get a few days of dryer weather, this will likely go in pretty quickly. That said it's a bit like laying tile so it can be tedious.
 

Disstevefan1

Well-Known Member
I would not be happy if this project was at my house and it was taking this long for path, never mind at Magic Kingdom. This should have been a week-long job at most.
Maybe they are using the same crew for both this and Moana and they just work a little on this one, then a little on that one, ya know switch back and forth. They can save $$$ that way.

It doesn’t matter how long they take on anything, folks are still showing up.
 

JoeCamel

Well-Known Member
This is meant to be part of TRON’s extended queue so the turtle and the sloth better team up!
Looks like they are on the home stretch now, once they start with the field pavers all the prep is done. Lay them up, sand/grout them solid and you are done.
Unless they spend two months glazing them to have the perfect shades of grey....
 