Sorry my point was if they have resisted taking it down due to capacity, waiting until TBA is up doesn’t really help that issue. At best it’s a wash, and at worse it’s a net reduction in capacity because BTMRR has a higher hourly output and as
@ToTBellHop mentioned, there are more likely more people in general who will ride BTMRR instead of TBA because of the large drop vs the mild BTMRR coaster.
Really my point is the covid closure/slowdown would have been the time for them to do things like this (when cash was CHEAP) but this basically keeps MK at the status quo on capacity and running at a decreased load from January of 2023 to roughly July-Sept of 2025. It’s somewhat insane to think their flagship property won’t have operated at full capacity for over two years+.