Originally posted by ISTCNavigator57
am I the only one who thinks one month doesn't seem like long enough to enclose a theatre?
Originally posted by ISTCNavigator57
am I the only one who thinks one month doesn't seem like long enough to enclose a theatre?
Originally posted by ISTCNavigator57
am I the only one who thinks one month doesn't seem like long enough to enclose a theatre?
And Bamboo7's supervisor possibly as well....Originally posted by Vernonpush
a great show now will be over the top!:sohappy:
Originally posted by ISTCNavigator57
I guess I was just discouraged by it taking them 4 mos. to basically repaint the outside of the GMR and make very few changes on the inside.
Originally posted by Aragorn22
BUT WHY ARE THEY CLOSING DOWN THE FESTIVAL OD THE LION KING??![]()
Originally posted by DigitalDisney
This is a real sign that AK is maturing, folks. Once FFF and Everest open, AK will be a very good park that nobody could possibly overlook.
Originally posted by DigitalDisney
I might actually consider seeing this show now that the theater will be air conditioned. Hah
Originally posted by Aragorn22
Does anyone know what are the height ranges for PLUTO AND TIMON??
:brick:![]()
![]()
![]()
Originally posted by Mary Poppins
Two of the inner walls are already up in the back of the Giraffe and Lion sections as well as the coopela at the top of the theater. Air conditioning is already being pumped in, although, it doesn't feel much cooler since the enclosure isn't complete.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.