“Festival of the Lion King†theater to be enclosed

wdwmagic

Administrator
Moderator
Premium Member
Originally posted by ISTCNavigator57
am I the only one who thinks one month doesn't seem like long enough to enclose a theatre?

LOL yes! ;)

I remember how fast they put the walls around Rock n Roller Coaster, and that was a considerably bigger task!
 

bamboo7

Active Member
Original Poster
Originally posted by ISTCNavigator57
am I the only one who thinks one month doesn't seem like long enough to enclose a theatre?

well, i believe they also are installing a new air-conditioning system.
 

DigitalDisney

New Member
This is a real sign that AK is maturing, folks. Once FFF and Everest open, AK will be a very good park that nobody could possibly overlook.

I might actually consider seeing this show now that the theater will be air conditioned. Hah
 

AndyP

Active Member
are the making it bigger or just closing off the gaps? CLosing off the gaps won't take that long. And AC is fairly simple. Month seems right to me. Anyway, good news about that :D
 
Originally posted by ISTCNavigator57
am I the only one who thinks one month doesn't seem like long enough to enclose a theatre?

Two of the inner walls are already up in the back of the Giraffe and Lion sections as well as the coopela at the top of the theater. Air conditioning is already being pumped in, although, it doesn't feel much cooler since the enclosure isn't complete.
 

Tim G

Well-Known Member
Originally posted by Vernonpush
a great show now will be over the top!:sohappy:
And Bamboo7's supervisor possibly as well.... :D
I thought E&E was on need to know bases only...:confused:

But maybe I'm wrong, I'm such a dreamer...
 

cindy_k

Well-Known Member
I am happy :sohappy: and sad :( about this news.

Happy that they are enclosing the theater for this awesome show and sad because they are doing during my next trip.

Oh Well can't have everything.

Cindy in NY:wave:
 

ToTBellHop

Well-Known Member
I guess I was just discouraged by it taking them 4 mos. to basically repaint the outside of the GMR and make very few changes on the inside. I guess this can be done in a month, provided they don't work at the same, dead-slow pace they rehabbed GMR, or worse...Matterhorn Bobsleds and the King Arthur Carrousel at DL:eek:
 

wdwmagic

Administrator
Moderator
Premium Member
Originally posted by ISTCNavigator57
I guess I was just discouraged by it taking them 4 mos. to basically repaint the outside of the GMR and make very few changes on the inside.

That wasnt such a minor GMR rahab. They...

- Replaced the entire sound system in the show building
- Replaced all the on-vehicle sound systems
- Updated the effects in the alien, gangster and western scene
- New props and foliage throughout
- Reprogrammed and rehabbed the major animatronics
- Repainted entire exterior
- Repainted and replaced interior set scenes
- New script
- New neon signs on the extrior

Thats a pretty big rehab!
 

CTXRover

Well-Known Member
Originally posted by Aragorn22
BUT WHY ARE THEY CLOSING DOWN THE FESTIVAL OD THE LION KING?? :confused:

I'm not quite sure if you missed something or not, so I'll just re-state it ;) FOTLK show will TEMPORARILY be closing in August to enclose the theater enabling it to be climate-controlled. (In other words, making a cool place for people to see a show in a rather "hot" park) The same show will reopen in the same theater in a month after it is enclosed. Hope that answers your question. :)
 

DMC-12

It's HarmonioUS, NOT HarmoniYOU.
Originally posted by DigitalDisney
This is a real sign that AK is maturing, folks. Once FFF and Everest open, AK will be a very good park that nobody could possibly overlook.

Eh... I would not hold your breath as far as AK Maturing... I mean if they keep the park open PAST 5PM once FFF and Everest is open... THEN maybe there will be some hope that this will be more than just a half day park...lol

Originally posted by DigitalDisney
I might actually consider seeing this show now that the theater will be air conditioned. Hah

Ha-Ha! Same here! :lol:
 

Mikejakester

Active Member
Oooy... O hope his is not trying to be funny...
:dazzle:
Anyways... I just have to say it,

This is good news....I mean I needed this after the whole AE stich thing...OY!, If the stich thing in AE is true... MK will not be on my visit list... :brick: I'll change it to AK
 

bamboo7

Active Member
Original Poster
Originally posted by Mary Poppins
Two of the inner walls are already up in the back of the Giraffe and Lion sections as well as the coopela at the top of the theater. Air conditioning is already being pumped in, although, it doesn't feel much cooler since the enclosure isn't complete.

The AC and walls that you speak of are all very temporary.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom