PERMITS

NobodyElse

Well-Known Member
Doesn't it seem a little late to be adding new amps to the ride when it is due to open so soon?

It kind of does, but who knows? It could be that once they got into full testing, (and playing all the new music at the desired levels) they discovered some clipping or something. This could be as simple as swapping out the amps for beefier models with more headroom. This could require extra panel / breaker work as well.
 

SuddenStorm

Well-Known Member
It kind of does, but who knows? It could be that once they got into full testing, (and playing all the new music at the desired levels) they discovered some clipping or something. This could be as simple as swapping out the amps for beefier models with more headroom. This could require extra panel / breaker work as well.

I really hope this isn't the case. People go to school to study this stuff, there should be no question that what was installed originally could or could not handle what they would need it to, for years to come.
 

Disney Irish

Premium Member
I really hope this isn't the case. People go to school to study this stuff, there should be no question that what was installed originally could or could not handle what they would need it to, for years to come.

Until you do full testing you don't know what a system will or won't handle. You can build a system for all scenarios in the world, but until you do real world testing you don't know if you missed something or something needs to be adjusted. Its why testing is done.
 

SSG

Well-Known Member
Original Poster
Indy getting a little work

Issued BLD2017-01943 MORROW MEADOWS CORPORATION 1313 S HARBOR BLVD 2501 (Indy Jones Adventure) Electrical for Disneyland - Adventureland - Indiana Jones - Tenant Improvement: Enclose existing door and relocated to new location, framing and drywall to interior non-bearing wall. REF: BLD2016-05556

Issued BLD2017-01960 WALT DISNEY WORLD CO 1313 S HARBOR BLVD 2104 (Adventureland) Disney - Adventureland - Indiana Jones Adventure - Electrical to replace (2) audio amplifiers.
 

SSG

Well-Known Member
Original Poster
More Indy:

BLD2017-01971 Electrical for Disney - Building 2501 - DLR Indiana Jones - Ride Motion Protection

BLD2017-01972 Electrical for Disney - Building 2501 - DLR Indiana Jones - (6) control cabinets.
 

TP2000

Well-Known Member
I really hope this isn't the case. People go to school to study this stuff, there should be no question that what was installed originally could or could not handle what they would need it to, for years to come.

Or some celebrity Imagineer like Joe Rohde decides 60 days before opening that some hallway or corner of the queue or a specific ride scene needs more bass, or more treble, or louder effects. And so they change it last minute to get it right, because Disneyland isn't Knott's or Six Flags.
 

SSG

Well-Known Member
Original Poster
BLD2017-01974 Disneyland - SW - DL Frontierland Expansion - BLDG 10070/Interactive BOH - New Commercial Construction: 2,950 s.ft cast members green/support rooms and roof top dome for equipment . Attached themed retaining wall 53 ln.ft x 11'8" high. Attached cast member bridge.
 

SuddenStorm

Well-Known Member
Or some celebrity Imagineer like Joe Rohde decides 60 days before opening that some hallway or corner of the queue or a specific ride scene needs more bass, or more treble, or louder effects. And so they change it last minute to get it right, because Disneyland isn't Knott's or Six Flags.

I think the most likely reason for the new audio equipment is that the existing stuff is a decade old (unless they've changed it already). Eventually, the equipment will wear out so they're likely just taking this opportunity to upgrade everything so they can get another decade of reliable use.
 

nevol

Well-Known Member
My guess is that these permits are materializing after the fact. The matterhorn fastpass signs, for example, were just posted but the ride reopened weeks ago. That retaining wall is intense stuff, 53 feet by 11, so its almost certainly been constructed already (perhaps months ago).
 

SSG

Well-Known Member
Original Poster
Summer of Heroes rolls along.
Issued BLD2017-02013 MORROW MEADOWS CORPORATION 1515 S HARBOR BLVD Electrical to install (1) apparatus equipment not listed DCA - Buena Vista Street - Turnstiles (204) - Summer of Heroes Permanent Supports for future Signage. REF:BLD2017-02013
 