Wow they really speed it up!
It takes usually a week to have a foundation poured, be able to dry and then receive the wall wooden frame on top of it..
Then it takes another week to have the wall wooden frame done, the concrete to be poured, and the wall itself to dry..
If they continue at this speed, they should be able to finish the entire plaza by the end of the month.
I don’t think they will be able to finish the wall along the railroad and the wall in-between which needs the railroad wall to be finished to end on it (if it makes sense…)
Based on this, we can expect August to be focus on:
- Railroad tracks
- Plaza slab
If they work quick enough, we can even think that they will start cosmetic works and vegetations…
After that, they only have to (perhaps) add tiles to the plaza and the elevated path (as per Shanghai), the railing and the entrance canopy.
Again.. no movement at the Tommorowland Lights & Power but I imagine they just need to finish the corner on the entrance side. They will open up the back and just refresh/paint the whole and… TADA!
Though it’s very tight to imagine opening in October… November could be, but they never opened anything in November before….
December the 5th (Walt birthday..) is usually their spot..
It would be a shame as I am going just before thanksgiving… so if any cast members are in this forum to give me access to a preview against dinner… give me a shout! Haha
It takes usually a week to have a foundation poured, be able to dry and then receive the wall wooden frame on top of it..
Then it takes another week to have the wall wooden frame done, the concrete to be poured, and the wall itself to dry..
If they continue at this speed, they should be able to finish the entire plaza by the end of the month.
I don’t think they will be able to finish the wall along the railroad and the wall in-between which needs the railroad wall to be finished to end on it (if it makes sense…)
Based on this, we can expect August to be focus on:
- Railroad tracks
- Plaza slab
If they work quick enough, we can even think that they will start cosmetic works and vegetations…
After that, they only have to (perhaps) add tiles to the plaza and the elevated path (as per Shanghai), the railing and the entrance canopy.
Again.. no movement at the Tommorowland Lights & Power but I imagine they just need to finish the corner on the entrance side. They will open up the back and just refresh/paint the whole and… TADA!
Though it’s very tight to imagine opening in October… November could be, but they never opened anything in November before….
December the 5th (Walt birthday..) is usually their spot..
It would be a shame as I am going just before thanksgiving… so if any cast members are in this forum to give me access to a preview against dinner… give me a shout! Haha
Last edited: