ILOVEDISNEY
Active Member
When we left for the northern missions mid-May they were paving near the backstage lots. The bridge over the creek was nearing completion. What they have planned by the fire station was still now clear. I am guessing by the time we return in mid-October the project, at least to the fire station, should be done. There was no preliminary surveying, or engineering on Floridian Way that I know of, just the two-lane blacktop to the back entrance to the Grand Floridian.