Andrew M
Well-Known Member
On one of the sites that shall not be named, it looks like the rebar and formwork are being put in for the final part of the retaining wall for the track between the end of the current tunnel and the peoplemover. Hopefully once that is poured they can start relaying the track through there another week or two after.