mm121
Well-Known Member
I generically said loading zone instead of separating loading and securityI do agree with most of this, but the pink will likely be the security screening and then loading will be inside the structure. Also I would say all guest paths, escalator, elevators, and stairs, will lead into this courtyard. The courtyard is the public zone (allowing the public access to the bridge), whereas the pink area and inside the structure will be the secure zone.
But this is what I meant, think it's getting clearer where everything is going now.