Watch this spooky adventure we had at the opening event of Phantom Manor, we did one of the first on rides, the attraction opens back up to the public on the 3rd of May
The changes aren't that minimal. They installed an entirely new model of Doombuggy, switched out most of the portraits, added and changed lighting effects, installed new AA's, new mirror ghost, changed the ending.... They pretty much altered nearly every aspect of the ride. A Six Month downtime sounds pretty efficient for all that.Disgraceful it was closed so long.
The changes are minimal to excuse for a 6 month closure.
Why wouldn't it be?Headed there early July, hoping it’s open!
With my luck, there would be a temporary 24 hour shutdownWhy wouldn't it be?
Disgraceful it was closed so long.
The changes are minimal to excuse for a 6 month closure.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.