6/6/2018 - Disney Hollywood Studio - Interamerica Stage Inc
384 Cypress Dr (GE) - Installation of owner furnished show equipment
6/6/2018 - Disney Hollywood Studio - Brilliant Creative Fabrication Llc
745 Stage Lane (TSL Entrance) - Instllation of shop fabricated kiosk
6/6/2018 - Epcot - Barton Malow Company
Project S - SWPPP, clearning/grubbing, grading and site capture (Guardians) - 1350 Avenue of the Stars
6/7/2018 - Epcot - Barton Malow Company
Installation of triple wide project trailer that will be used by WDI - 1150 Avenue of the Stars #D
6/15/2018 - - Sign Producers Inc
Parcel: 11 24 27 0000 00 001 -
6/15/2018 - Disney Hollywood Studio - Artistic Entertainment Services
384 Cypress Dr - Fbrication and installtion of Show Set Pieces
6/21/2018 - Art of Animation Resort - Pcl Construction Services Inc
1910 A Animation Way - POP/ADDR REstroom Facility
6/28/2018 - Disney Hollywood Studio - Hubbard Construction Company
783 Studio Dr - Bus Loop Restroom Fire Lane
6/28/2018 - Epcot - Barton Malow Company
700 Woodpecker Lane - New security booth to be installed, including pre-manufactured building
6/28/2018 - Epcot - Barton Malow Company
2025 Avenue of the Stars - New security booth to be installe, including pre-manufactured building
7/2/2018 - Epcot - Barton Malow Company
700 Woodpecker Lane - New security booth to be instal, including pre-manufactured Building
7/3/2018 - Disney Hollywood Studio - Hubbard Construction Company
950 N Studio Dr - Booth Installation Area Development
7/3/2018 - Misc - Balfour Beatty Construction Llc
600 E Buena Vista Dr - Install temporary office trailer container for Project C1
7/11/2018 - Disney Hollywood Studio - Technomedia Solutions Llc
390 Cypress Dr (Galaxy's Edge) - AV low voltage system instalation and terminations
7/11/2018 - Disney Springs - Druco Development Co Inc
2000 Hotel Plaza Blvd - Tower addition to existing hotel
7/11/2018 - Epcot - Adena Corporation
1350 Avenue of the Stars (Guardians of the Galaxy) - Installation
7/30/2018 - Epcot - Balfour Beatty Construction Llc
1650 Avenue of the Stars (Epcot Marina) - Installation of four new mooring dolphins, permanent anchors, platforms and bollards
7/30/2018 - Other - Balfour Beatty Construction Llc
1169 W Buena Vista Dr - Kenpat Conex #2
7/30/2018 - Other - Balfour Beatty Construction Llc
1169 W Buena Vista Dr - Mader Conex
8/1/2018 - Disney Hollywood Studio - Mlc Theming Inc
575 Stage Lane (Somewhere near Pixar Place) - General Cosntruciton
8/10/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1084 Sea Breeze Dr - Slide Structure and Foundation, waterslide and stair structure and foundation
8/10/2018 - Disney Hollywood Studio - Veatic
235 Cypress Dr - Install signs
8/10/2018 - Disney Hollywood Studio - Don Bell Signs Llc
750 N Studio Dr - New marquee letters, hours sign, and pedestian crossing signs
8/10/2018 - Disney Springs - Icarus Exhibits Inc
Disney Springs, RDE complex at Walt Disney World - Install statues of green aliens from Toy Story
8/10/2018 - Epcot - Balfour Beatty Construction Llc
1650 Avenue of the Stars (Marina) - Improve mooring w/ addtl. data; Grade yard; Install retention wall and fire lane access
8/10/2018 - Magic Kingdom - Whiting Turner Contracting Co
4970 N World Dr (Tron) - MK-2 Building Completion
8/13/2018 - Magic Kingdom - Whiting Turner Contraction Co
1258 Magic Kingdom Dr - MK-2 Restroom building
8/15/2018 - Carribean Beach Resort - Pcl Construction
1086 Sea Breeze Dr - Bus stop and connected walkway
8/27/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1080A Sea Breeze Dr - Gondola Connector Walkway
8/27/2018 - Magic Kingdom - Whiting Turner Contracting Co
4950 N World Drive #B - Install power and data into cubicles inside Space Mountain Entrance/Exit Bldg
8/27/2018 - Offsite - Dpr Construction
7141 S Kirkman Rd - New office space buildout on floors 1, 2 & 3 which totally 96,00 sq ft.
8/27/2018 - Offsite - Dpr Construction
7012 Grand National Dr - New office space buildout on floos 1, 2 & 3 which totally 96,000 sq ft
8/31/2018 - Disney Springs - Keator Construction Llc
1526 1E E Buena Vista Dr, Town Center B28-107 - Interior buildout for Orange County Sherriff's Office
9/5/2018 - Disney Hollywood Studio - Mad Creative Fabrication Llc
555 Stage Lane (Mickey & Minnie's Runaway Railway) - Scenes 5, 7 & Queue Installation
9/11/2018 - Epcot - Balfour Beatty Construction Llc
Showcase Boat Dock East, 1678 Avenue of the Stars #C - Team to bring additional power and data to the existing Epoct Mexico Dock
9/17/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
396 Cypress Dr (Galaxy's Edge) - Fabrication and Installation of Show Set Pieces
9/18/2018 - Disney Hollywood Studio - Nassal Company
394 Cypress Dr (Galaxy's Edge) - 1002W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns
9/18/2018 - Disney Hollywood Studio - Nassal Company
386 Cypress Dr (Galaxy's Edge) - 1001W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns
9/18/2018 - Disney Hollywood Studio - Nassal Company
380 Cypress Dr (Galaxy's Edge) - 1007W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns
9/18/2018 - Disney Hollywood Studio - Nassal Company
375 Cypress Dr (Galaxy's Edge) - 1000W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns
9/19/2018 - Disney Hollywood Studio - Interamerica Stage
394 Cypress Dr (Galaxy's Edge) - Fabrication and Installation of Show Set Pieces
9/19/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
394 Cypress Dr (Galaxy's Edge) - Fabrication and Installation of Show Set Pieces
9/26/2018 - Disney Hollywood Studio - Veatic
235 Cypress Dr (Backlot Express) - Install new marquee
9/26/2018 - Disney Hollywood Studio - Veatic
150 Showbiz Blvd - Install new marquee
9/26/2018 - Disney Hollywood Studio - Veatic
575 Stage Lane (near TSL) - Install marquee and menu board
9/26/2018 - Disney Hollywood Studio - Brilliant Creative Fabrication Llc
384 Cypress Dr - Fabrication & Installation of show set props for Project D 1004 show set package
9/26/2018 - Epcot - Balfour Beatty Construction Llc
1400 Avenue of the Starts (Innoventions) - Addtl. power, data, architectural modes to conference room, and addl HVAC service to EER
9/27/2018 - Disney Hollywood Studio - Veatic
351 Cypress Dr (Near Muppets) - Install new marquee
10/1/2018 - Art of Animation Resort - Pcl Construction Services Inc
2020 Animation Way - Installation of Boat Dock at Hour Glass Lake
10/2/2018 - Disney Hollywood Studio - Nassal Company
396 Cypress Dr - 1006W Exterior Architectural Ornamentation, scenic & interior show set elements
10/2/2018 - Disney Hollywood Studio - Maddox Electric Company Inc
151 Ascot Dr - Permament power to new fan locations in front of F&B bldg in Toy Story Land
10/4/2018 - Animal Kingdom - Maddox Electrical Inc
Everest Run Data cat 5 cables to 15th floor for Apex computer - 2564 Everest, 734 Weirkhe Way
10/4/2018 - Animal Kingdom - Maddox Electrical Inc
Everest Run flex lines to new remote readout box for track switch 2&3 - 2564 Everest 734 Werikhe Way
10/5/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
854 Sunset Blvd (Flex Space) - Fabrication and instalation of Scenic Elements
10/8/2018 - Disney Hollywood Studio - Artistic Entertainment Services
555 Stage Lane (Mickey and Minnie's Runaway Railroad) - Fabrication and installation of Show Set Pieces
10/10/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1145 Cayman Way - Construction of equipment storage building
10/10/2018 - Disney Hollywood Studio - Jon Richards Company Fl Inc
375 Cypress Dr - Attachment of pre-fabricated show set prop element
10/10/2018 - Disney Hollywood Studio - Jon Richards Company Fl Inc
384 Cypress Dr - Attachment of pre-fabricated show set prop element
10/15/2018 - - Whiting Turner Contracting Co
5601 Pluto Park Lane - MK-2 Pluto Park laydown perimeter fence
10/15/2018 - Magic Kingdom - Whiting Turner Contracting Co
4950 N World Dr - Space Mountain Generator Relocation
10/15/2018 - Magic Kingdom - Whiting Turner Contracting Co
1254 Magic Kingdom Dr (Tomorrowland Speedway) - MK TS Mods
10/18/2018 - Disney Hollywood Studio - Sign Producers Inc
390 Cypress Dr (Galaxy's Edge) - Project D - Building 1003 Fabricate and Op Sign
10/18/2018 - Disney Hollywood Studio - Sign Producers Inc
375 Cypress Dr - Project D - Building 1000 Area Development Fabricate and Op Sign
10/18/2018 - Disney Hollywood Studio - Hubbard Construction Company
351 S Studios Dr - BOH Upgrades - Toll Booth Demo
10/18/2018 - Magic Kingdom - Sign Producers Inc
1305 Monorail WY #B - Tomorrowland MLF Sign
10/24/2018 - Carribean Beach Resort - Austin Commercial Lp
1145 Cayman Way - Demo of job site trailer for the 88-1 project. Terminate and cap off utilities
10/24/2018 - Disney Hollywood Studio - Whiting Turner Contracting Co
375 Cypress Dr - 1000W - RWS Antenna Foundation & Pole
10/25/2018 - Fort Wilderness - Balfour Beatty Construction
198 Frontier Way - Clearing, grubbing, site work, storm pipe installation, paving for a new hauling and access road
10/25/2018 - Misc - Balfour Beatty Construction
3790 C2 N World Dr - Clearing, grubbing, site work, storm pipe installation, paving for site trailers
10/29/2018 - Fort Wilderness - Balfour Beatty Construction
4550, 4500 #A, 4600 #B, 4600, 4700 Big Pine Rd - Demo assocaited eith existing sturcture, utilities and surrounding configuration
10/30/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1080A Sea Breeze Dr - Project 88-2 Sign Foundations
11/1/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
201 S Studio Dr - Site Trailer Package 91) for Project H
11/1/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
201 S Studio Dr - Civil Package - Mass grading and 48" storm relocation
11/1/2018 - Disney Hollywood Studio - Maddox Electric Company Inc
400 Ascot Dr (Slinkey Dog) - Install two new fans on existing circuit LB-28 in the queue
11/6/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
980 Osceola Parkway (changed from 201 S Studio Dr) - Civil PAckage - Mass graing and 48" storm relocation
11/8/2018 - Disney Hollywood Studio - Maddox Electric Company
200 Ascot Dr - Install two new fans on existing circuit in the Aliens Saucer Ride Gantry
11/14/2018 - Disney Hollywood Studio - Elite Av Systems
555 Stage Lane (Minnie and Mickey's Runaway Railroad) - Install and terminate show control cabinets
11/16/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
201 S Studio Dr - Project H - Foundations, slab, structural steel and precast panels
11/27/2018 - Disney Hollywood Studio - Mad Creative Fabrication Llc
351 S Studio Dr (Little Mermaid) - Install Scenery
11/27/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
854 Sunset Blvd - Fabrication and installation of Mechanical Elements
11/27/2018 - Disney Hollywood Studio - Hubbard Construction Company
Temp Toll Booth - 950 N Studio Dr
12/10/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1080A Sea Breeze Dr - Project 88-2 Kiosk
12/11/2018 - Disney Hollywood Studio - Design Communications Ltd
854 Sunset Blvd (Flex Space) - Installation of graphics
12/18/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1114 Cayman Way - Area Development
12/18/2018 - Disney Hollywood Studio - Hudson Scenic Studio
384 Cypress Dr (Galexy's Edge) - Attachment of wall panel element (33) anchored to existing facility
12/19/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1084 D Sea Breeze Dr - Project 88-2 Kiosk
12/19/2018 - Disney Hollywood Studio - Interamerica Stage Inc
375 Cypress Dr (Galaxy's Edge) - Installation of extrior prop
12/20/2018 - Disney Hollywood Studio - Interamerica Stage
555 Stage Lane (Minnie Mickey) - Install show systems
12/21/2018 - Disney Hollywood Studio - Bungalow Scenic Studios
571 Stage Lane - General Construction
12/21/2018 - Disney Hollywood Studio - Bungalow Scenic Studios
585 Stage Lane - General Construction
12/21/2018 - Disney Hollywood Studio - Vision Three Sixty Llc
555 Stage Lane (MMRR) - General Construction