After some discussion with Steve, I have decided to step back into the role of “permit coordinator”, but we have also decided some changes are necessary.

The biggest part of this job was maintaining the thread that list all the permits that Disney files. Over the past year I have noticed I was seeing fewer permits that could clearly be identified as something interesting. I am not sure if this was intentional obfuscation by Disney or simply a change in the way these permits were getting written. The end result of this is that I was spending a lot of time documenting all the permits for little gain.

The plan going forward is that I will review the permits looking for ones that are clearly of interest and I will post these in the appropriate thread and also maintain a list here. There will be a lot fewer permits posted and it may take me a few days to get to them. I also have no plans to continue updating the project specific permit threads like the one for the DHS permits. With these changes I should be able to keep up with the permits without missing out on potentially interesting information.

--------------------------------------------------------------------------------------------


A few notes about the purpose of this thread...

Despite the name, this thread actually lists Notices of Commencement (NOCs) for construction projects around the WDW property. A NOC is a document that must be filed before work on a specific project can begin and is usually filed shortly before work starts. It's main purpose is to assure that contractors get paid on time once the work is complete. NOCs will sometimes have an explicit expiration date, but most of the time a date is not specified in which case they expire one year from the filing date.

The documents generally don't contain much information. They will list the location where the work is being done, for example the name of a ride or store. They also show a description of the work being done which is normally very vague, for example "Electrical" or "Construction". Some of the NOCs I post will just say "BVCC". This stands for Buena Vista Construction Company which is Disney's internal construction company. The work description on BVCC permits is almost always the very vague "Provide labor, material and/or electrical for construction".

Previous Years
2017
2016
2015
2014
2013
2012
2011
 
Last edited:

danlb_2000

Premium Member
Original Poster
The post will contain permits from the South Florida Water Management District. These are filed whenever a project will effect storm water control in some way, for example creating new hard surfaces like building or roads where there were not hard surfaces before. These permits are not as common but are normally for larger project and contain much more detail them the NOCs.

171211-11 - Parcel H 1 Mass Grading And L402 Berm Restoration (DHS) - Plans
180124-6 - 403 Basin Stormwater Master Plan (Epcot) - Plans
180130-291 - Golden Oak Phase 5 - Plans
180305-371- Project 89 Geotech Borings (Wilderness Lodge) - Plans
180402-11 - Project H Clearing/ Stockpile - Plans
180409-6 - Fl Solar 5 L L C Project - Plans
180625-12 - Western Way Stockpile - Plans
180402-434 - Project H Wetland Borings - Plans
180702-2 - K Building - Plans
180702-5 - L 402 Basin Update Project H - Plans, Eng Report
180625-8 - Lift Station 11 A Force Main - Plans
180611-7 - Flamingo Crossings Phase 1 Parcels H2, H3, H4 & R5 - Plans 1
180517-3 - Magic Kingdom East Side Modification - Plans
180507-6 - Stolport Stockpile - Plans
180716-4 - Pluto Parking Lot - Plans
180723-14 - Coronado Springs Pond 9/ Bvd-6 Modification - Plans
180813-1 - Black Lake Hotel - Plans
180910-12 - Hourglass Lake Boat Dock - Plans
181001-6 - Flamingo Crossings L L C Housing - East - Plans 1, Plans 2, Geotechnical Report
181022-11 - Dc-21 Warehouse - Plans
181105-1 - C-2 Hotel (New Swan/Dolphin hotel) - Plans
181129-3 - Stolport Spur Road - Plans
181203-3 - Disney Animal Kingdom Back Of House Building - Plans
181205-19 - Reedy Creek Mitigation Bank (Blackwater Crossing)
181210-1 - Stolport Trailer Compound - Plans
181217-4 - Pluto Parking Lot - Plans
 
Last edited:

danlb_2000

Premium Member
Original Poster
1/4/2018 - Disney Hollywood Studio - H o a r Construction Llc
750 N Studio Dr - New Guest Auto Plaza - New Auto Plaza

1/16/2018 - Magic Kingdom - Whiting Turner Contracting Co
MK-2 early site preperation package - 4970 N World Dr (Tron)

1/17/2018 - Disney Hollywood Studio - Icarus Exhibits Inc
394 Cypress Dr (Galaxy's Edge) - Project D - Fabricate and isntall kiosks

1/17/2018 - Disney Hollywood Studio - Icarus Ehibits Inc
394 Cypress Dr (Galaxy's Edge) - Project D - FAbricate and Install Food Service Show Element

1/17/2018 - Disney Hollywood Studio - Whiting Turner Contracting Company
375 Cypress Dr (Galaxy's Edge) - Project D - 1000W - Amednment 6 - Area Development Revisions

1/18/2018 - Disney Hollywood Studio - H o a r Construction Llc
783 Studios Drive #A - DHS Bus Shelter A - New Bus Shelters

1/18/2018 - Disney Hollywood Studio - H o a r Construction Llc
783 Studios Drive #B - DHS Bus Shelter B - New Bus Shelters

1/18/2018 - Disney Hollywood Studio - H o a r Construction Llc
783 Studios Drive #C - DHS Bus Shelter C - New Bus Shelters

1/18/2018 - Disney Hollywood Studio - H o a r Construction Llc
783 Studios Drive #D - DHS Bus Shelter D - New Bus Shelters

1/23/2018 - Stolport - Pcl Construction Services Inc
Installation of 6-wide trailer - 360 World Drive

1/24/2018 - Carribean Beach Resort - Pcl Construction Services Inc
Installing transporation system componetns for TIG 1-7, TPD 1-12, ad THS 1-12 - 1051 Sea Breeze Dr

1/26/2018 - Magic Kingdom - Pcl Construction
1403 Monorail Way - Procide entertainment cast memeber building including; metal building and all interior finishes

2/7/2018 - Disney Hollywood Studio - Adirondack Scenic Inc
390 Cypress Dr (Galaxy's Edge) - Show set installtion

2/12/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
151 Ascot Dr (TSL Quick Service) - Fabrication and installation os show set pieces

2/20/2018 - Disney Springs - John Mccann Associates
Quick Serve Restaurant (Plant Hollywood) - Interior alteration for a new resturant within and existing restuarnt

2/22/2018 - Disney Hollywood Studio - Adena Corporation
200 Ascot Dr (TSL) - Installation of Owner Provided Show Set Pieced

2/23/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
200 Ascot Dr (TSL) - Fabrication and installation of show set pieces

2/23/2018 - Disney Hollywood Studio - Themeworks Inc
585 Stage Lane (TSMM) - Fabrication and installation of show set pieces

3/14/2018 - Disney Springs - Dpr Construction
1486 E Buena Vista Dr, NBA Experience - Demo of structure and additional work

3/22/2018 - Epcot - Balfour Beatty Construction Llc
1830 F Avenue of the Stars - Underground MEPF, Foundations, Masonary, Roof, MEPF, Finishes

3/23/2018 - Disney Hollywood Studio - Hubbard Construction Company
100 Cypress Dr (Hollywood Blvd) - Electrical System Install

3/23/2018 - Saratoga Springs Resort - Pcl Construction Services Inc
1948 Broadway - Modificaiton to model room inside Saratoga Springs Center

3/27/2018 - Epcot - Balfour Beatty Construction Llc
1830 Avenue of the Stars (France) - BOH Architectural Facade Renovation

3/27/2018 - Misc - Balfour Beatty Construction
600 E Buena Vista Dr (Gondola Laydown Yard) - Site Clearing, Grading, Drainage, Gravel, Chain Link Fence & Underground Utility

3/29/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1051 Sea Breeze Dr #A - Trinidad Bus Station

4/2/2018 - Disney Hollywood Studio - Icarus Exhibits Inc
151 Ascot Drive (TSL Restrooms) - Fabricate and install show set pieces

4/2/2018 - Disney Hollywood Studio - H o a r Construction Llc
783 Studios Dr #A (New Bus Loop Restrooms) - Area Development Construction

4/4/2018 - Epcot - Malow Barton
1350 Avenue of the Stars (GOTG) - Install enclosure, stairs, catwalks, masonary and fireproofing

4/13/2018 - Disney Hollywood Studio - Whiting Tumer Contracting Co
378 Cypress Dr (Galaxy's Edge) - 1005W Building - Foundation, Steel Structure, Core & Shell

4/20/2018 - Other - Balfour Beatty Construction Llc
Architectural Facade Mock Ups, Steel Structure, Concrete Foundations, Finishes - 3400 W Osceloa Pkwy, Bay Lake

5/7/2018 - Epcot - Adirondack Scenic Inc
1830 C Avenue of the Stars - Installation of Showsets for Project M

5/9/2018 - Epcot - Barton Malow Company
1713 Epcot Resorts Blvd - Excavate 35 acre storm water pong, outfall storm pipeline and overflow weir

5/14/2018 - Animal Kingdom - Pro Sound Inc
580 Dinoland Dr - Install low voltage rack, ground speakers, and perform audio terminations

5/14/2018 - Disney Hollywood Studio - Pro Sound Inc
555 Stage Lane (Mickey & Minnie's Runaway Railway) - A/V racks, speaker distribution boxes, video distribution equip., speaker inst

5/17/2018 - Animal Kingdom - Artistic Entertainment Services Llc
580, 610 Dinoland Dr - Fabrication and install of Show Set Props

5/17/2018 - Animal Kingdom Lodge - Artistic Entertainment Services Llc
580, 594, 610, 671 Dinoland Dr - Fabrication and Installation of Show Set Sign

5/17/2018 - Magic Kingdom - Whiting Turner Contracting Co
1200 Monorail Way - MK-2 South Pond Site Prep

5/18/2018 - Animal Kingdom - Icarus Exhibits Inc
778 Weirkhe Way - Fabricate and install stage

5/23/2018 - Disney Hollywood Studio - Buena Vista Construction Company
535 Stage Lane - Install aluminum framed gate, 25'w and 140' of construction hard barricade

5/23/2018 - Disney Hollywood Studio - H o a r Construction Llc
215 Cypress Dr - New chain link fence and sidewalks

5/25/2018 - Epcot - Barton Malow Company
1365 Avenue of the Stars #A (WDI) - Early release package for construction of office building

5/25/2018 - Magic Kingdom - Whiting Turner Contracting Co
4970 N World Drive - Conex and gate entrance

5/31/2018 - - Hubbard Construction Company
750 N Studio Dr - Auto Plaza Fire Line
 
Last edited:

danlb_2000

Premium Member
Original Poster
6/6/2018 - Disney Hollywood Studio - Interamerica Stage Inc
384 Cypress Dr (GE) - Installation of owner furnished show equipment

6/6/2018 - Disney Hollywood Studio - Brilliant Creative Fabrication Llc
745 Stage Lane (TSL Entrance) - Instllation of shop fabricated kiosk

6/6/2018 - Epcot - Barton Malow Company
Project S - SWPPP, clearning/grubbing, grading and site capture (Guardians) - 1350 Avenue of the Stars

6/7/2018 - Epcot - Barton Malow Company
Installation of triple wide project trailer that will be used by WDI - 1150 Avenue of the Stars #D

6/15/2018 - - Sign Producers Inc
Parcel: 11 24 27 0000 00 001 -

6/15/2018 - Disney Hollywood Studio - Artistic Entertainment Services
384 Cypress Dr - Fbrication and installtion of Show Set Pieces

6/21/2018 - Art of Animation Resort - Pcl Construction Services Inc
1910 A Animation Way - POP/ADDR REstroom Facility

6/28/2018 - Disney Hollywood Studio - Hubbard Construction Company
783 Studio Dr - Bus Loop Restroom Fire Lane

6/28/2018 - Epcot - Barton Malow Company
700 Woodpecker Lane - New security booth to be installed, including pre-manufactured building

6/28/2018 - Epcot - Barton Malow Company
2025 Avenue of the Stars - New security booth to be installe, including pre-manufactured building

7/2/2018 - Epcot - Barton Malow Company
700 Woodpecker Lane - New security booth to be instal, including pre-manufactured Building

7/3/2018 - Disney Hollywood Studio - Hubbard Construction Company
950 N Studio Dr - Booth Installation Area Development

7/3/2018 - Misc - Balfour Beatty Construction Llc
600 E Buena Vista Dr - Install temporary office trailer container for Project C1

7/11/2018 - Disney Hollywood Studio - Technomedia Solutions Llc
390 Cypress Dr (Galaxy's Edge) - AV low voltage system instalation and terminations

7/11/2018 - Disney Springs - Druco Development Co Inc
2000 Hotel Plaza Blvd - Tower addition to existing hotel

7/11/2018 - Epcot - Adena Corporation
1350 Avenue of the Stars (Guardians of the Galaxy) - Installation

7/30/2018 - Epcot - Balfour Beatty Construction Llc
1650 Avenue of the Stars (Epcot Marina) - Installation of four new mooring dolphins, permanent anchors, platforms and bollards

7/30/2018 - Other - Balfour Beatty Construction Llc
1169 W Buena Vista Dr - Kenpat Conex #2

7/30/2018 - Other - Balfour Beatty Construction Llc
1169 W Buena Vista Dr - Mader Conex

8/1/2018 - Disney Hollywood Studio - Mlc Theming Inc
575 Stage Lane (Somewhere near Pixar Place) - General Cosntruciton

8/10/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1084 Sea Breeze Dr - Slide Structure and Foundation, waterslide and stair structure and foundation

8/10/2018 - Disney Hollywood Studio - Veatic
235 Cypress Dr - Install signs

8/10/2018 - Disney Hollywood Studio - Don Bell Signs Llc
750 N Studio Dr - New marquee letters, hours sign, and pedestian crossing signs

8/10/2018 - Disney Springs - Icarus Exhibits Inc
Disney Springs, RDE complex at Walt Disney World - Install statues of green aliens from Toy Story

8/10/2018 - Epcot - Balfour Beatty Construction Llc
1650 Avenue of the Stars (Marina) - Improve mooring w/ addtl. data; Grade yard; Install retention wall and fire lane access

8/10/2018 - Magic Kingdom - Whiting Turner Contracting Co
4970 N World Dr (Tron) - MK-2 Building Completion

8/13/2018 - Magic Kingdom - Whiting Turner Contraction Co
1258 Magic Kingdom Dr - MK-2 Restroom building

8/15/2018 - Carribean Beach Resort - Pcl Construction
1086 Sea Breeze Dr - Bus stop and connected walkway

8/27/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1080A Sea Breeze Dr - Gondola Connector Walkway

8/27/2018 - Magic Kingdom - Whiting Turner Contracting Co
4950 N World Drive #B - Install power and data into cubicles inside Space Mountain Entrance/Exit Bldg

8/27/2018 - Offsite - Dpr Construction
7141 S Kirkman Rd - New office space buildout on floors 1, 2 & 3 which totally 96,00 sq ft.

8/27/2018 - Offsite - Dpr Construction
7012 Grand National Dr - New office space buildout on floos 1, 2 & 3 which totally 96,000 sq ft

8/31/2018 - Disney Springs - Keator Construction Llc
1526 1E E Buena Vista Dr, Town Center B28-107 - Interior buildout for Orange County Sherriff's Office

9/5/2018 - Disney Hollywood Studio - Mad Creative Fabrication Llc
555 Stage Lane (Mickey & Minnie's Runaway Railway) - Scenes 5, 7 & Queue Installation

9/11/2018 - Epcot - Balfour Beatty Construction Llc
Showcase Boat Dock East, 1678 Avenue of the Stars #C - Team to bring additional power and data to the existing Epoct Mexico Dock

9/17/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
396 Cypress Dr (Galaxy's Edge) - Fabrication and Installation of Show Set Pieces

9/18/2018 - Disney Hollywood Studio - Nassal Company
394 Cypress Dr (Galaxy's Edge) - 1002W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns

9/18/2018 - Disney Hollywood Studio - Nassal Company
386 Cypress Dr (Galaxy's Edge) - 1001W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns

9/18/2018 - Disney Hollywood Studio - Nassal Company
380 Cypress Dr (Galaxy's Edge) - 1007W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns

9/18/2018 - Disney Hollywood Studio - Nassal Company
375 Cypress Dr (Galaxy's Edge) - 1000W Exterior Architectural Ornamentation, Scenic and Interior Show Set Elemetns

9/19/2018 - Disney Hollywood Studio - Interamerica Stage
394 Cypress Dr (Galaxy's Edge) - Fabrication and Installation of Show Set Pieces

9/19/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
394 Cypress Dr (Galaxy's Edge) - Fabrication and Installation of Show Set Pieces

9/26/2018 - Disney Hollywood Studio - Veatic
235 Cypress Dr (Backlot Express) - Install new marquee

9/26/2018 - Disney Hollywood Studio - Veatic
150 Showbiz Blvd - Install new marquee

9/26/2018 - Disney Hollywood Studio - Veatic
575 Stage Lane (near TSL) - Install marquee and menu board

9/26/2018 - Disney Hollywood Studio - Brilliant Creative Fabrication Llc
384 Cypress Dr - Fabrication & Installation of show set props for Project D 1004 show set package

9/26/2018 - Epcot - Balfour Beatty Construction Llc
1400 Avenue of the Starts (Innoventions) - Addtl. power, data, architectural modes to conference room, and addl HVAC service to EER

9/27/2018 - Disney Hollywood Studio - Veatic
351 Cypress Dr (Near Muppets) - Install new marquee

10/1/2018 - Art of Animation Resort - Pcl Construction Services Inc
2020 Animation Way - Installation of Boat Dock at Hour Glass Lake

10/2/2018 - Disney Hollywood Studio - Nassal Company
396 Cypress Dr - 1006W Exterior Architectural Ornamentation, scenic & interior show set elements

10/2/2018 - Disney Hollywood Studio - Maddox Electric Company Inc
151 Ascot Dr - Permament power to new fan locations in front of F&B bldg in Toy Story Land

10/4/2018 - Animal Kingdom - Maddox Electrical Inc
Everest Run Data cat 5 cables to 15th floor for Apex computer - 2564 Everest, 734 Weirkhe Way

10/4/2018 - Animal Kingdom - Maddox Electrical Inc
Everest Run flex lines to new remote readout box for track switch 2&3 - 2564 Everest 734 Werikhe Way

10/5/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
854 Sunset Blvd (Flex Space) - Fabrication and instalation of Scenic Elements

10/8/2018 - Disney Hollywood Studio - Artistic Entertainment Services
555 Stage Lane (Mickey and Minnie's Runaway Railroad) - Fabrication and installation of Show Set Pieces

10/10/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1145 Cayman Way - Construction of equipment storage building

10/10/2018 - Disney Hollywood Studio - Jon Richards Company Fl Inc
375 Cypress Dr - Attachment of pre-fabricated show set prop element

10/10/2018 - Disney Hollywood Studio - Jon Richards Company Fl Inc
384 Cypress Dr - Attachment of pre-fabricated show set prop element

10/15/2018 - - Whiting Turner Contracting Co
5601 Pluto Park Lane - MK-2 Pluto Park laydown perimeter fence

10/15/2018 - Magic Kingdom - Whiting Turner Contracting Co
4950 N World Dr - Space Mountain Generator Relocation

10/15/2018 - Magic Kingdom - Whiting Turner Contracting Co
1254 Magic Kingdom Dr (Tomorrowland Speedway) - MK TS Mods

10/18/2018 - Disney Hollywood Studio - Sign Producers Inc
390 Cypress Dr (Galaxy's Edge) - Project D - Building 1003 Fabricate and Op Sign

10/18/2018 - Disney Hollywood Studio - Sign Producers Inc
375 Cypress Dr - Project D - Building 1000 Area Development Fabricate and Op Sign

10/18/2018 - Disney Hollywood Studio - Hubbard Construction Company
351 S Studios Dr - BOH Upgrades - Toll Booth Demo

10/18/2018 - Magic Kingdom - Sign Producers Inc
1305 Monorail WY #B - Tomorrowland MLF Sign

10/24/2018 - Carribean Beach Resort - Austin Commercial Lp
1145 Cayman Way - Demo of job site trailer for the 88-1 project. Terminate and cap off utilities

10/24/2018 - Disney Hollywood Studio - Whiting Turner Contracting Co
375 Cypress Dr - 1000W - RWS Antenna Foundation & Pole

10/25/2018 - Fort Wilderness - Balfour Beatty Construction
198 Frontier Way - Clearing, grubbing, site work, storm pipe installation, paving for a new hauling and access road

10/25/2018 - Misc - Balfour Beatty Construction
3790 C2 N World Dr - Clearing, grubbing, site work, storm pipe installation, paving for site trailers

10/29/2018 - Fort Wilderness - Balfour Beatty Construction
4550, 4500 #A, 4600 #B, 4600, 4700 Big Pine Rd - Demo assocaited eith existing sturcture, utilities and surrounding configuration

10/30/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1080A Sea Breeze Dr - Project 88-2 Sign Foundations

11/1/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
201 S Studio Dr - Site Trailer Package 91) for Project H

11/1/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
201 S Studio Dr - Civil Package - Mass grading and 48" storm relocation

11/1/2018 - Disney Hollywood Studio - Maddox Electric Company Inc
400 Ascot Dr (Slinkey Dog) - Install two new fans on existing circuit LB-28 in the queue

11/6/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
980 Osceola Parkway (changed from 201 S Studio Dr) - Civil PAckage - Mass graing and 48" storm relocation

11/8/2018 - Disney Hollywood Studio - Maddox Electric Company
200 Ascot Dr - Install two new fans on existing circuit in the Aliens Saucer Ride Gantry

11/14/2018 - Disney Hollywood Studio - Elite Av Systems
555 Stage Lane (Minnie and Mickey's Runaway Railroad) - Install and terminate show control cabinets

11/16/2018 - Disney Hollywood Studio - Pcl Construction Services Inc
201 S Studio Dr - Project H - Foundations, slab, structural steel and precast panels

11/27/2018 - Disney Hollywood Studio - Mad Creative Fabrication Llc
351 S Studio Dr (Little Mermaid) - Install Scenery

11/27/2018 - Disney Hollywood Studio - Artistic Entertainment Services Llc
854 Sunset Blvd - Fabrication and installation of Mechanical Elements

11/27/2018 - Disney Hollywood Studio - Hubbard Construction Company
Temp Toll Booth - 950 N Studio Dr

12/10/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1080A Sea Breeze Dr - Project 88-2 Kiosk

12/11/2018 - Disney Hollywood Studio - Design Communications Ltd
854 Sunset Blvd (Flex Space) - Installation of graphics

12/18/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1114 Cayman Way - Area Development

12/18/2018 - Disney Hollywood Studio - Hudson Scenic Studio
384 Cypress Dr (Galexy's Edge) - Attachment of wall panel element (33) anchored to existing facility

12/19/2018 - Carribean Beach Resort - Pcl Construction Services Inc
1084 D Sea Breeze Dr - Project 88-2 Kiosk

12/19/2018 - Disney Hollywood Studio - Interamerica Stage Inc
375 Cypress Dr (Galaxy's Edge) - Installation of extrior prop

12/20/2018 - Disney Hollywood Studio - Interamerica Stage
555 Stage Lane (Minnie Mickey) - Install show systems

12/21/2018 - Disney Hollywood Studio - Bungalow Scenic Studios
571 Stage Lane - General Construction

12/21/2018 - Disney Hollywood Studio - Bungalow Scenic Studios
585 Stage Lane - General Construction

12/21/2018 - Disney Hollywood Studio - Vision Three Sixty Llc
555 Stage Lane (MMRR) - General Construction
 
Last edited:

Progress.City

Well-Known Member
Placeholder 7
Placeholder 7 has always been my favorite! Super “like” given!

(Of course this is an understatement because the actual project that will become the Project Formerly Known as Placeholder 7 will most likely be far more massive and incredibly more interesting than we could have possibly imagined!)
 

Brainleech419

Well-Known Member
Placeholder 7 has always been my favorite! Super “like” given!

(Of course this is an understatement because the actual project that will become the Project Formerly Known as Placeholder 7 will most likely be far more massive and incredibly more interesting than we could have possibly imagined!)