Surferboy567
Well-Known Member
Well, they're ONLY doing all this testing on one of the three lines. Sounds like they'll move on to testing the other lines one at a time (guessing Pop/Aoa to CBR will be next) and while they are testing the other lines we won't see much if any movement on the DHS line.
If they stop testing on the DHS line...doesn't that mean (besides the station architecture) that at least the DHS line is operational...basically?