lazyboy97o
Well-Known Member
The architect and plumbing engineer choose the outlet locations and are responsible for coordination with the civil engineer. This is only a contractor issue if they obstructed the primary drain or improperly graded the hardscape. Even then, the designers chose to outflow right into the queue.The problem there wasn’t the designers it was the contractors.