NoChesterHester
Well-Known Member
Remember not so long ago when several people posted the mine train wasn't going to happen because the swinging cars couldn't be engineered?? :lol:
Remember not so long ago when several people posted the mine train wasn't going to happen because the swinging cars couldn't be engineered?? :lol:
I recall widespread reports that there were difficulties with the ride vehicles and that there were changes to the track layout.Remember not so long ago when several people posted the mine train wasn't going to happen because the swinging cars couldn't be engineered?? :lol:
In the area of the old Dumbo, it appears that the lowest portion of the base in red is still in place. You would think that would be removed by now or are they just going to cover over it?
Im still new, and not sure how to quote a previous post, but in reply to the post about some structure in front of the bridge...
While i have no official way to confirm this, but judging by the how the horizontal steel is at about grade level, it may just be a tied retaining wall or MSE wall, if the dirt from either side of the walkway may be removed when finished. Great eyes to pick that out, and i'm a bit of a engineering nerd if its not too obvious :slurp:
Im still new, and not sure how to quote a previous post, but in reply to the post about some structure in front of the bridge...
While i have no official way to confirm this, but judging by the how the horizontal steel is at about grade level, it may just be a tied retaining wall or MSE wall, if the dirt from either side of the walkway may be removed when finished. Great eyes to pick that out, and i'm a bit of a engineering nerd if its not too obvious :slurp:
EDIT: but the more i look at it, it may just be a temporary retaining wall to keep dirt from sliding onto the exposed slab their currently working on
Yeah I was wondering why they removed some of the cement but not all of it?
Im still new, and not sure how to quote a previous post, but in reply to the post about some structure in front of the bridge...
While i have no official way to confirm this, but judging by the how the horizontal steel is at about grade level, it may just be a tied retaining wall or MSE wall, if the dirt from either side of the walkway may be removed when finished. Great eyes to pick that out, and i'm a bit of a engineering nerd if its not too obvious :slurp:
EDIT: but the more i look at it, it may just be a temporary retaining wall to keep dirt from sliding onto the exposed slab their currently working on
I must have missed it...what exactly is going on in front of HM, construction-wise?
Great shots! Does Scott K. ever get images of the NEW animation resort on his fly overs?
New walkway from Fantasyland into Liberty Square, and new bathrooms by Small World...
I wonder if this will be covered like the thru-way bathrooms to frontierland from adventureland. Sound like a similar situation.
http://www.wdwmagic.com/Attractions...nstruction-site---coaster-steel-is-rising.htm
Great views of the coaster steel.
Thanks Scott!!
I wonder if this will be covered like the thru-way bathrooms to frontierland from adventureland. Sound like a similar situation.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.