Here are some updated photos of the Haunted Mansion rehab going on. Externally
Originally posted by orlpassholder
Shot 3 (is this an area that is a stretching room?)
Originally posted by wvuej
Any ideas how long the rehab us to last? I am going on Oct. 5 and HM is one of my favorite rides, I hope they are finished by then.
Originally posted by jmarc63
No The Streaching room is not located there, It is just a false facade, the streaching room are on the opposite side of the Mansion building, thats where the manision connects with the ride building
Originally posted by Skipper Timekpr
Actually Jamrc those are the stretch rooms the one covered up is Stretch 2.
Originally posted by Skipper Timekpr
Actually Jamrc those are the stretch rooms the one covered up is Stretch 2.
Originally posted by raven
No. The stretch rooms are on your left as you enter the building. This room that is shown is the "obsevatory" and it is actually on the right side of the building. The blue prints for the building show that this area is only for decor. It isn't real at all.
Originally posted by jmarc63
Somewhere out there on the net is a diagram of the doom buggy layout showing where everything is in relationshop to the exterior.
Originally posted by RobFL
Funny thing... The area with the big black tarp is the area I saw being painted in January, during park hours. Was an odd experience, but the workman even waved to us.
Wonder what work is being done since the paintjob obviously didn't cut it.
-Rob
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.