Rob562
Well-Known Member
Are they working simultaneously on the interior and exterior, meaning the outside is finished while the inside is finished and the outside is themed while the inside is being themed?
As with just about any construction project, only limited interior work can be done until the building is to the point of being weather-proof. So apart from roughing in electrical and plumbing, no real work would be done until all roof and walls, windows and doors are installed.
But, once that's done, the interior people can be working on installation while exterior construction on the themeing elements continues.
-Rob