Goofyernmost
Well-Known Member
I must have gotten side tracked again. I wasn't really thinking about the interchange, I was looking at what still has to be done to complete the bus stops at DHS. It's not a lot, but, as I've stated before the devil is in the details. I see the bus loops as not being done in October. November/December maybe. As far as the interchange I think that will be a whole lot longer (that could be February or later.) However, sometimes it is amazing how quickly some of that stuff can come together.The entrance plaza is looking good, I could see that being done in a month. What I don't think will be ready is the Osceola interchange. The entrance and exit ramps marked in red could be done, but I don't think the exit in blue will be ready, especially since it looks like it needs to join with the new flyover which is just starting. The original bid documents I saw also said that the DHS entrance would not open all at once.
View attachment 305865