Looking out my balcony window from Bay Lake Tower and spotted two cranes outside, one near the castle and the other near Splash Mountain. I would assume they're taking the lights down and maybe painting the exterior, respectively?
Looking out my balcony window from Bay Lake Tower and spotted two cranes outside, one near the castle and the other near Splash Mountain. I would assume they're taking the lights down and maybe painting the exterior, respectively?
Yes light removal for the castle and track installation on Splash.
^ Nah, DCA has the Wall tittle.
Steve...Any word or pics on the Castle refurb? Is that even underway yet?
Just getting started on that now. First walls up
http://www.wdwmagic.com/Attractions...Cinderella-Castle-ready-for-refurbishment.htm
Cool. Can't wait for more, thanks!
Did they fill in the bannister on that staircase on the backside? Never remembered it to be solid. :lol:
LOL I had to double check with a photo to confirm, but there were filled in previously, it's not new.
are these the cranes?Looking out my balcony window from Bay Lake Tower and spotted two cranes outside, one near the castle and the other near Splash Mountain. I would assume they're taking the lights down and maybe painting the exterior, respectively?
are these the cranes?
Also at BLT. Splash crane is missing today.
Soon enough...WOW. That's a little much.
Wish there was a third one, though...Hello, FLE.
WOW. That's a little much.
Wish there was a third one, though...Hello, FLE.
If the look of the FLE site says anything, I wouldn't expect cranes for a long time.
I think we might see one for TLM, right?
No, I'm not saying you won't see any, I'm saying you're gonna have to wait a while.
They were clearing/flattening out the land last week. Foundations mush be done, etc, before vertical construction starts.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.