Construction behind Fantasmic

roj2323

Well-Known Member

This looks like a micro tunneling project to me. There should be a second hole of similar size somewhere on property.

mto.jpg
423380



This is very likely a project to fix the sewer problems on that side of the park. It's very very common for the bathrooms at the end of Sunset (in front of tower) to overflow when faced with a heavy attendance day.
 

Creathir

Premium Member
This looks like a micro tunneling project to me. There should be a second hole of similar size somewhere on property.

mto.jpg
View attachment 423380


This is very likely a project to fix the sewer problems on that side of the park. It's very very common for the bathrooms at the end of Sunset (in front of tower) to overflow when faced with a heavy attendance day.

Perhaps it’s the start of the Disney Hyperloop system.
;)

It is directly in alignment with SWGE and the SW Hotel, maybe it’s the boring of a new tunnel to connect the hotel to the park?

(Fantastical, completely illogical ideas)
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom