Gabe1
Ivory Tower Squabble EST 2011. WINDMILL SURVIVOR
I think most of the walls trusses were all built and put in place by cranes was it not?
You can see the progression from the beginning of my trip to the last few days of my trip.
I'm shooting into the sun so they are dark but you can see the sections of the walls that construction workers are building and filling in and with the crane where they are working on a small portion of one of the roofs.
If they were built offsight I did not see that happen. There was only one crane up for all the units that I ever saw in use. I can't wrap my brain about all these prefabs coming in by barge and making the progress they did in less than 2 weeks. It be different if they could truck in prefabs to the construction sight but this is a site surrounded by water. But I saw the barges floating out materials but because I didn't see any prefab units on those barges, that is not saying I didn't miss floating prefabs in the lake. It certainly couldn't be like the prefab of the Contemporary but I could buy into all the beams and truss pieces all landing on the pier cut to length. There were around 20 guys per unit working.
Where I did see prefab construction like you indicate, in a manner I hadn't seen before was Dwarf. 3rd Week of April 2012. It was actually kind of intimidating. There were massive pieces of sold concrete squares and rectangles floating through the air, foundation and pillars. As I was walking into Circus floating above me (don't think that was planned) was a twirling slab of concrete larger than my 2 1/2 car garage footprint and a couple feet thick. After that week it appeared that the prefab foundation for the main mountain of Dwarf was put together like a puzzle. It was pretty awesome, I've only seen foundations poured on construction sights.
Last edited: