lazyboy97o
Well-Known Member
The point is that the parks dig down, regardless of whatever excuses you try to concoct. The water line is not a constant and is something you need a geotechnical report to determine. The level of a nearby man made pond doesn’t tell you anything nor does the fact that a building pad was created mean anything.it was 20ft below the soil line which, and as i just told you, the edge of the park is graded at least 20ft higher than the water line, they shot it out with concrete like a pool. it was well documented by Bio
the bourne building will also be on graded landed, im not really sure what point youre making