I thought 2011 but now i'm hearing 2013?
I read titles like this post and think this person must not even read the site! Though I have less than 60 posts myself, I've been reading this site for years... literally.
Oh silly questions!
Interesting observation RunnerEd!
Another point of reference is that the DCA foundation construction began in August, 2009 after the Golden Dreams theater was demolished and cleared in July, 2009. That's about the state the WDW version was in during mid summer of 2010 with earth movers pushing dirt around the FLE area.
The DCA version is strongly rumored to be able to host soft openings in April, 2011.
Both TLM and BATB are moving right along at MK. When I was back there the other day, the ballroom in BATB and the Under the Sea circular scene in TLM were clearly visible in the framework. I assume that BATB would be ready to open first, as it's just a restaurant, and doesn't have a ride system or numerous animatronics to install and program.
I thought 2011 but now i'm hearing 2013?
None of it was to be open by 2011.
2012 will be the first phase, then it will finish up in 2013
Little mermaid should be done in 2012
How far along is the ride, anyhow? I know we can't exactly go poke our heads in there, but inside elements, like the characters , the clammobiles, and some set pieces have to have been doubled from the construction of the clone in DCA. So theoretically (and have mercy on my soul if I'm just hopelessly naive about construction), there should be all that much to do besides installing the ride system the AA's. I say "all that much", but how long does it really need, especially with a huge team.
Possible, yes. Logistics and budget as always count for a lot.The one at DCA opens in Spring 2011, but the MK version should open in 2012. The current progress gives it a possibility of soft opening in fall 2011.