DAAR = Disney's Art of Animation Resort?
Yes.
DAAR = Disney's Art of Animation Resort?
Thought this was interesting. Buena Vista Construction permit for a Boat Ramp at DAAR. Wonder what that is going to be for.
Boat Ramp - Provide labor, material and/or electrical for construction
DAAR = Disney's Art of Animation Resort?
Yes, most definitely. Then plans look pretty cool, to be honest.
Yes jewel of the seven seas looks pretty awesome. I gotta say if this is what RFID and next gen is all about I'm all for it and understand why Disney is investing billions into it. It will put them WAY ahead of any other theme park competitor. I was shocked how good it looked when I saw the prints. Now if we can get more of this and get rid of that horid thing called sorcerers of the kingdom we will be in business.
Perhaps they do these at all bodies of water, but camouflage them? Something to allow access for water rescues, cleaning, etc.
It's definitely not for guests to launch watercraft. Unless they're actually going to put in a marina.....which would officially take DAAR up to "Moderate" status.
Is this the official new abbreviation for it?
Right. Fewer screens....more interactive props. If they're going to get technical, at least make it blend in, like Jewel will.
Can you elaborate? When will this be up and running for guests? :wave:
Lots of Buena Vista Construction permits for the Magic Kingdom over the past two days. Check out the first page of this thread for all the details.
Fiber/Networking possibly for NextGen and/or park wide Wi-Fi?
The locations seem too obscure to be for NextGen stuff. But the park WiFi would make sense. I didn't read the article about it, so I don't know exactly where these "hot spots" will be, but this could be the start.
Would this be the sort of work Buena Vista would do? I would think that we be done my a more specialized contractor.
Theres a permit a few days ago for SSE's "ride envelope". Is that the external facade between the loading area and the geodesic sphere? Or is that internal? Like the descent where the lights and triangles are?
Permit today for "Fantasmic Area Development". Look at the drawing in the permit the location of this work is to the right (when entering Fantasmic) of the Fantasmic entrance path, and behind the BatB theatre. Doesn't currently appear to be anything in that space.
Backstage Fantasmic Area Development - General Construction
Here is a picture of where the work area is.
Interesting. The contractor on the project looks like they do mostly residential and office type construction, although they do also feature museum construction. But nothing on their website shows any amusement/theme park work.
Theres a permit a few days ago for SSE's "ride envelope". Is that the external facade between the loading area and the geodesic sphere? Or is that internal? Like the descent where the lights and triangles are?
I am guessing that this isn't work on the ride itself and I don't think it's connected to the rumor of changes to the descent. There were a couple permits filed the same day for various Epcot attractions all from the same contractor, so I am guessing that they are doing related work at each attraction.
Permit today for "Fantasmic Area Development". Look at the drawing in the permit the location of this work is to the right (when entering Fantasmic) of the Fantasmic entrance path, and behind the BatB theatre. Doesn't currently appear to be anything in that space.
Backstage Fantasmic Area Development - General Construction
Here is a picture of where the work area is.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.