Theres not much to update this month....
*2 of the huge side walls that support the dome they had to remove to pull out the old track have been filled with insulation and re-installed. One side wall still is left open (rocket removal spur track to backstage).
*Trucks now are mainly dropping off stair cases and random other steel pieces.
*Saw photos of lift hill number 2 (Time warp) and load-unload station. All Im going to say is that rocket ship that was in the middle of the load-unload room(DL -2000 Ithink) is still there but its no longer white.
*No sightings yet of rockets on property.
Buzz
*Some rooms have already started prop/final paint load-in and some of the rooms have been finnished and sealed off from construction.
Fliers have been seen asking for transfer opportunities for test and adjust positions at both attractions.
*2 of the huge side walls that support the dome they had to remove to pull out the old track have been filled with insulation and re-installed. One side wall still is left open (rocket removal spur track to backstage).
*Trucks now are mainly dropping off stair cases and random other steel pieces.
*Saw photos of lift hill number 2 (Time warp) and load-unload station. All Im going to say is that rocket ship that was in the middle of the load-unload room(DL -2000 Ithink) is still there but its no longer white.
*No sightings yet of rockets on property.
Buzz
*Some rooms have already started prop/final paint load-in and some of the rooms have been finnished and sealed off from construction.
Fliers have been seen asking for transfer opportunities for test and adjust positions at both attractions.